CH-53K Heavy Lift Helicopter Program Conducts Successful APU Test | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Sun, Aug 29, 2010

CH-53K Heavy Lift Helicopter Program Conducts Successful APU Test

Program Achieves "Ready To Load" Status

The CH-53K Heavy Lift Helicopter Program has achieved "Ready to Load" (RTL) condition with the successful light-off of its first Auxiliary Power Unit (APU) engine. The achievement signals that the program is ready to begin formal integration testing in early 2011. The APU provides power to a 45KVA generator, a 58-horsepower hydraulic pump and hydraulic starter, and also provides bleed air to an environmental control system and main engine start system. It is used for ground operations, main engine start, and conditions when main electrical power provided by the aircraft's main generators is lost. It is a critical element of the aircraft's design.


CH-53K Artist's Rendering

The APU achieved RTL condition after light-off at 100 percent speed sustained for 30 seconds. The engine is now being prepared for safety of flight testing and accomplishing the on-time delivery of hardware for the ground test vehicle.

The APU Light-Off test was conducted at the San Diego facility of Hamilton Sundstrand, the primary supplier for the secondary power system for the CH-53K heavy lift helicopter program. HS is providing the APU, environmental control system (ECS), and the main engine start system consisting of an air turbine starter and start control valve.

The entire APU development and qualification program will involve 13 engines - seven for Hamilton Sundstrand and six for Sikorsky. The APU is a critical part of the secondary power system on the CH-53K helicopter, providing a pressurized air source ("bleed air") for the Hamilton ECS and main engine start system, as well as shaft power for the Goodrich 45KVA generator and Eaton 58- horsepower hydraulic pump.

Sikorsky Aircraft received a $3 billion System Development and Demonstration (SDD) contract on April 5, 2006 to develop a replacement for the U.S. Marine Corps CH-53E heavy lift helicopter. The new aircraft program is planned to include production of more than 200 aircraft. Currently, the CH-53K helicopter is in the SDD phase with all major subcontracts awarded and valued at over $1.1 billion. The CH-53K helicopter will maintain virtually the same footprint as its predecessor, the three-engine CH-53E SUPER STALLION, but Sikorsky says it will nearly triple the payload to 27,000 pounds over 110 nautical miles under "hot high" ambient conditions. The company says the CH-53E helicopter is currently the largest, most powerful marinized helicopter in the world.

FMI: www.sikorsky.com

Advertisement

More News

ANN's Daily Aero-Term (05.09.24): Hold Procedure

Hold Procedure A predetermined maneuver which keeps aircraft within a specified airspace while awaiting further clearance from air traffic control. Also used during ground operatio>[...]

ANN's Daily Aero-Term (05.06.24): Altitude Readout

Altitude Readout An aircraft’s altitude, transmitted via the Mode C transponder feature, that is visually displayed in 100-foot increments on a radar scope having readout cap>[...]

ANN's Daily Aero-Linx (05.06.24)

Aero Linx: European Hang Gliding and Paragliding Union (EHPU) The general aim of the EHPU is to promote and protect hang gliding and paragliding in Europe. In order to achieve this>[...]

Airborne-NextGen 05.07.24: AI-Piloted F-16, AgEagle, 1st 2 WorldView Sats

Also: Skydio Chief, Uncle Sam Sues, Dash 7 magniX, OR UAS Accelerator US Secretary of the Air Force Frank Kendall was given a turn around the patch in the 'X-62A Variable In-flight>[...]

Aero-News: Quote of the Day (05.07.24)

"The need for innovation at speed and scale is greater than ever. The X-62A VISTA is a crucial platform in our efforts to develop, test and integrate AI, as well as to establish AI>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC