Ground Broken For New Control Tower In Melbourne, FL | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Fri, Jan 27, 2017

Ground Broken For New Control Tower In Melbourne, FL

Facility Expected To Be Operational By The End Of 2017

A groundbreaking ceremony was held this week at Orlando Melbourne International Airport (KMLB) for a new, 115-foot-tall control tower that is expected to be operational later this year.

The tower, which will cost some $5.3 million, will replace the tower that has served the airport for more than 50 years, according to a report appearing in Florida Today. The new tower has been a priority for airport Executive Director Greg Donovan since he was hired in 2014.

Since such facilities at airports the size of KMLB are not high on the FAA's priority list, Donovan developed a funding strategy to get the project moving. That included the airport paying half the cost of the tower, and a grant from the Florida Department of Transportation covering the other half.

The current tower stands only 79 feet tall, and has no elevator or handicap access.

Donovan said that the new tower will be able to accommodate the "most advanced technology for not only air traffic control, but also safety and security of the whole airport environment."

(Artist's rendering of new tower provided)

FMI: www.mlbair.com

Advertisement

More News

ANN's Daily Aero-Term (05.09.24): Hold Procedure

Hold Procedure A predetermined maneuver which keeps aircraft within a specified airspace while awaiting further clearance from air traffic control. Also used during ground operatio>[...]

ANN's Daily Aero-Term (05.06.24): Altitude Readout

Altitude Readout An aircraft’s altitude, transmitted via the Mode C transponder feature, that is visually displayed in 100-foot increments on a radar scope having readout cap>[...]

ANN's Daily Aero-Linx (05.06.24)

Aero Linx: European Hang Gliding and Paragliding Union (EHPU) The general aim of the EHPU is to promote and protect hang gliding and paragliding in Europe. In order to achieve this>[...]

Airborne-NextGen 05.07.24: AI-Piloted F-16, AgEagle, 1st 2 WorldView Sats

Also: Skydio Chief, Uncle Sam Sues, Dash 7 magniX, OR UAS Accelerator US Secretary of the Air Force Frank Kendall was given a turn around the patch in the 'X-62A Variable In-flight>[...]

Aero-News: Quote of the Day (05.07.24)

"The need for innovation at speed and scale is greater than ever. The X-62A VISTA is a crucial platform in our efforts to develop, test and integrate AI, as well as to establish AI>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC