Third Poseidon Aircraft Enters Flight Testing Program | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.13.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Tue, Aug 03, 2010

Third Poseidon Aircraft Enters Flight Testing Program

T3 First Flew July 29

P-8A Poseidon aircraft T3 successfully completed its first flight test in Seattle on July 29. T3 is the P-8A program's mission-system and weapon-certification aircraft.


Poseidon T3 First Flight

During the two-hour and 48-minute flight from Boeing Field, Boeing and U.S. Navy test pilots performed airborne systems checks including engine accelerations and decelerations, autopilot flight modes, and auxiliary power unit and engine shutdowns and starts. In the coming weeks, T3 will join the two P-8A test aircraft currently at Naval Air Station Patuxent River, Md., and complete additional ground and flight tests.

"At Pax River, the Boeing and Navy team will use some of the ground test data we've gathered in Seattle for in-flight separation and delivery accuracy tests that will occur later this year," said Chris Ahsmann, P-8A chief engineer for Boeing.

T3 is one of six flight-test aircraft that are being assembled and tested as part of the U.S. Navy System Development and Demonstration contract Boeing received in 2004. Airworthiness-test aircraft T1 entered flight test in October 2009 and arrived at the Navy's Patuxent River facility in April of this year. T2, the primary mission-system test aircraft, arrived at Pax River in June.

The Navy plans to purchase 117 P-8A anti-submarine warfare, anti-surface warfare, intelligence, surveillance and reconnaissance aircraft to replace its P-3 fleet. Initial operational capability is planned for 2013.

FMI: www.navy.mil, www.boeing.com

Advertisement

More News

Sierra Space Repositions Dream Chaser for First Mission

With Testing Soon Complete, Launch Preparations Begin in Earnest Sierra Space's Dream Chaser has been put through the wringer at NASA's Glenn Armstrong Test Facility in Ohio, but w>[...]

ANN's Daily Aero-Term (05.10.24): Takeoff Roll

Takeoff Roll The process whereby an aircraft is aligned with the runway centerline and the aircraft is moving with the intent to take off. For helicopters, this pertains to the act>[...]

Aero-News: Quote of the Day (05.10.24)

“We’re proud of the hard work that went into receiving this validation, and it will be a welcome relief to our customers in the European Union. We couldn’t be mor>[...]

Aero-News: Quote of the Day (05.11.24)

"Aircraft Spruce is pleased to announce the acquisition of the parts distribution operations of Wag-Aero. Wag-Aero was founded in the 1960’s by Dick and Bobbie Wagner in the >[...]

ANN's Daily Aero-Term (05.11.24): IDENT Feature

IDENT Feature The special feature in the Air Traffic Control Radar Beacon System (ATCRBS) equipment. It is used to immediately distinguish one displayed beacon target from other be>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC