First Production VH-71 To Start Final Production Phase | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.20.24

Airborne-Unlimited-05.28.24

Airborne-FlightTraining-05.29.24 Airborne-Unlimited-05.30.24

Airborne-Unlimited-05.24.24

Mon, Jan 12, 2009

First Production VH-71 To Start Final Production Phase

Integration Of Helo's Systems Begins At Owego Facility

The first Lockheed Martin pilot production VH-71 presidential helicopter to begin the integration and final production process arrived at the company's Owego, NY, facility Friday. Six of nine helicopters that make up the first phase of the VH-71 presidential helicopter program are now in the US, including four test-configured aircraft and two production aircraft.

"The arrival of this production aircraft to the Lockheed Martin facility here is a great start to the new year, after a very successful year for the program in 2008," said Jeff Bantle, Lockheed Martin VH-71 vice president and general manager. "Four years into the program, six aircraft are in the US undergoing flight testing or integration, systems integration laboratories are fully functional and the helicopter is meeting or exceeding all key performance parameters."

The helicopter, pilot production aircraft number three (PP-3), will now be integrated with mission systems, outfitted with a cabin interior, painted in presidential livery and flight tested before being delivered to the US Navy and ultimately to Marine Helicopter Squadron One.

Two VH-71 test aircraft are also at the facility, undergoing mission systems installation. At Naval Air Station Patuxent River, MD two additional test helicopters are conducting flight testing, while production aircraft PP-1, which joined the test program November 24, is conducting ground vibration testing, after which it will also be flown to Lockheed Martin's Owego facility for integration and completion.

The VH-71 program is divided into two phases, or increments. Increment One provides five helicopters on an accelerated schedule with improved capabilities over the current fleet. Increment Two will provide a fleet of 23 helicopters that complete the White House requirements for a command and control platform.

FMI: www.lockheedmartin.com/

Advertisement

More News

ANN FAQ: Contributing To Aero-TV

How To Get A Story On Aero-TV News/Feature Programming How do I submit a story idea or lead to Aero-TV? If you would like to submit a story idea or lead, please contact Jim Campbel>[...]

ANN's Daily Aero-Linx (05.29.24)

Aero Linx: International Association of Professional Gyroplane Training (IAPGT) We are an Association of people who fly, build or regulate Gyroplanes, who have a dream of a single >[...]

ANN's Daily Aero-Term (05.29.24): NORDO (No Radio)

NORDO (No Radio) Aircraft that cannot or do not communicate by radio when radio communication is required are referred to as “NORDO.”>[...]

Airborne 05.28.24: Jump Plane Down, Starship's 4th, Vision Jet Problems

Also: uAvionix AV-Link, F-16 Viper Demo, TN National Guard, 'Staff the Towers' A Saturday afternoon jump run, originating from SkyDive Kansas City, went bad when it was reported th>[...]

ANN's Daily Aero-Term (05.30.24): Beyond Visual Line Of Sight (BVLOS)

Beyond Visual Line Of Sight (BVLOS) The operation of a UAS beyond the visual capability of the flight crew members (i.e., remote pilot in command [RPIC], the person manipulating th>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC