Soyuz Fully Assembled And Ready For Thursday Launch | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.13.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Thu, Sep 10, 2015

Soyuz Fully Assembled And Ready For Thursday Launch

Two Galileo Satellites To Be Boosted Into Orbit From French Guiana

The launcher for this week’s Arianespace Soyuz mission is ready for its September 10 liftoff, having been “topped off” with the payload of two European Galileo satellites at the Spaceport.

This will be the 12th mission from French Guiana for Arianespace’s medium-lift workhorse, as well as the company’s eighth flight in 2015 with its complete launcher family – which also includes the heavy-lift Ariane 5 and lightweight Vega.

During a busy day of activity Tuesday, the basic three-stage Soyuz was first rolled out to the launch zone in the Spaceport’s northwestern sector near the city of Sinnamary, followed by its raising to the vertical position and suspension over the launch pad – held in place by four large support arms.

After the 174-foot-tall mobile gantry was moved in to protect the launcher, this mission’s “upper composite” (composed of the Fregat upper stage, the two dispenser-mounted Galileo satellites and payload fairing) was hoisted and mated atop Soyuz.

Arianespace’s September 10 mission will be the fifth Soyuz flight with Galileo satellites performed from French Guiana – a series that began with the Russian-built launcher’s inaugural liftoff at the Spaceport in October 2011. 

RKTs-Progress (the Samara Space Center) is responsible for the design, development and manufacture of Soyuz’ three lower stages and payload fairing, as well as for integrating the launch vehicle stages and handling flight operations.  The Fregat upper stage is manufactured by NPO Lavochkinn

The passengers for this Thursday’s Flight VS12 are the fifth and sixth FOC (Full Operational Capability) spacecraft in Europe’s Galileo navigation program.  They were built by OHB System, with their navigation payloads supplied by Surrey Satellite Technology Ltd.

(Image provided by Arianespace)

FMI: www.arianespace.com

Advertisement

More News

Sierra Space Repositions Dream Chaser for First Mission

With Testing Soon Complete, Launch Preparations Begin in Earnest Sierra Space's Dream Chaser has been put through the wringer at NASA's Glenn Armstrong Test Facility in Ohio, but w>[...]

ANN's Daily Aero-Term (05.10.24): Takeoff Roll

Takeoff Roll The process whereby an aircraft is aligned with the runway centerline and the aircraft is moving with the intent to take off. For helicopters, this pertains to the act>[...]

Aero-News: Quote of the Day (05.10.24)

“We’re proud of the hard work that went into receiving this validation, and it will be a welcome relief to our customers in the European Union. We couldn’t be mor>[...]

Aero-News: Quote of the Day (05.11.24)

"Aircraft Spruce is pleased to announce the acquisition of the parts distribution operations of Wag-Aero. Wag-Aero was founded in the 1960’s by Dick and Bobbie Wagner in the >[...]

ANN's Daily Aero-Term (05.11.24): IDENT Feature

IDENT Feature The special feature in the Air Traffic Control Radar Beacon System (ATCRBS) equipment. It is used to immediately distinguish one displayed beacon target from other be>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC