Next Artemis Launch Attempt To Face Significant Delay | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.13.24

Airborne-NextGen-05.14.24

Airborne-Unlimited-05.15.24 Airborne-AffordableFlyers-05.16.24

Airborne-Unlimited-05.17.24

Mon, Sep 05, 2022

Next Artemis Launch Attempt To Face Significant Delay

Be Prepared For A Roll-Back

By Wes Oleszewski, ANN Space Correspondent

While everyone in the media is talking about the LH2 (Liquid Hydrogen) leak in the Space Launch System’s quick release connector, one small detail is somewhat overlooked.

When the current lunar launch window closes on Tuesday September 6, 2022, the certification date for the batteries in the vehicle command destruct system also expires. There is no way to re-certify the system at Launch Complex 39B because there is no access arm to that area of the booster. The only way to re-certify the system is by way of the access platforms in the VAB.

Thus, conjecture as to if or not the engineers need to construct some sort of weather shelter in order to service that leaky quick-disconnect in order to repair the LH2 leak at the launch pad is moot unless they can get it all done and launch before the command destruct system expires.

Although the VAB provides plenty of shelter from Florida’s weather, the downside to a roll-back and repair indoors is that once the repair is finished there is no way to completely test the fix. The only way to test that fitting is to roll the vehicle all the way back out to Pad 39B where the LH2 can be fed into the system.

Additionally, although it has been discovered that the August 29 scrub caused by readings that one of the core stage’s RS25 engines was not being properly chilled was caused by a faulty sensor- it is important to point out that the KSC weather rules went red 16 minutes before the launch window opened. The weather continued in the red through most of the launch window. So, faulty sensor or not, the launch was scrubbed for weather before it ever got started.

FMI: www.nasa.gov

Advertisement

More News

ANN's Daily Aero-Term (05.17.24): Very High Frequency

Very High Frequency The frequency band between 30 and 300 MHz. Portions of this band, 108 to 118 MHz, are used for certain NAVAIDs; 118 to 136 MHz are used for civil air/ground voi>[...]

ANN's Daily Aero-Linx (05.17.24)

Aero Linx: Aviation Suppliers Association Established February 25, 1993, the Aviation Suppliers Association (ASA), based in Washington, D.C., is a not-for-profit association, repre>[...]

ANN FAQ: Submit a News Story!

Have A Story That NEEDS To Be Featured On Aero-News? Here’s How To Submit A Story To Our Team Some of the greatest new stories ANN has ever covered have been submitted by our>[...]

Classic Aero-TV: ANN Visits Wings Over The Rockies Exploration Of Flight

From 2021 (YouTube Version): Colorado Campus Offers aVariety Of Aerospace Entertainment And Education Wings over the Rockies Exploration of Flight is the second location for the Wi>[...]

Airborne Affordable Flyers 05.16.24: PRA Runway, Wag-Aero Sold, Young Eagles

Also: Paramotor Champ's, Electric Ultralight, ICON BK Update, Burt Rutan at Oshkosh! The Popular Rotorcraft Association is reaching out for help in rebuilding their private runway >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC