AD: Airbus Airplanes | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.13.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Sat, Jul 01, 2017

AD: Airbus Airplanes

AD NUMBER: 2017-13-10

PRODUCT: Certain Airbus Model A319-131 and -132 airplanes; Model A320-231, -232, and -233 airplanes; and Model A321-131 and -231 airplanes.

ACTION: Final Rule.

SUMMARY: The FAA is superseding Airworthiness Directive (AD) 2003-18-06, which applied to the aircraft listed above.

AD 2003-18-06 required installing new anti-swivel plates and weights on the engine fan cowl door (FCD) latches and a new cowl door hold-open device. This AD retains the previous actions and requires modifying the engine FCDs, installing placards, and reidentifying the FCDs. This AD also adds airplanes to the applicability.

This AD was prompted by reports of additional engine FCD in-flight losses, and a new FCD front latch and keeper assembly that has been developed to address this unsafe condition.

The FAA estimates that this AD affects 558 airplanes of U.S. registry.

The actions required by AD 2003-18-06, and retained in this AD, take about 8 work-hours per product, at an average labor rate of $85 per work-hour. Required parts cost about $1,500 per product. Based on these figures, the estimated cost of the actions that are required by AD 2003-18-06 is $2,180 per product.

We also estimate that it takes about 6 work-hours per product to comply with the basic requirements of this AD. The average labor rate is $85 per work-hour. Required parts will cost about $9,676 per product. Based on these figures, we estimate the cost of this AD on U.S. operators to be $5,683,788, or $10,186 per product.

DATES: This AD is effective August 3, 2017.

FMI: AD

Advertisement

More News

Sierra Space Repositions Dream Chaser for First Mission

With Testing Soon Complete, Launch Preparations Begin in Earnest Sierra Space's Dream Chaser has been put through the wringer at NASA's Glenn Armstrong Test Facility in Ohio, but w>[...]

ANN's Daily Aero-Term (05.10.24): Takeoff Roll

Takeoff Roll The process whereby an aircraft is aligned with the runway centerline and the aircraft is moving with the intent to take off. For helicopters, this pertains to the act>[...]

Aero-News: Quote of the Day (05.10.24)

“We’re proud of the hard work that went into receiving this validation, and it will be a welcome relief to our customers in the European Union. We couldn’t be mor>[...]

Aero-News: Quote of the Day (05.11.24)

"Aircraft Spruce is pleased to announce the acquisition of the parts distribution operations of Wag-Aero. Wag-Aero was founded in the 1960’s by Dick and Bobbie Wagner in the >[...]

ANN's Daily Aero-Term (05.11.24): IDENT Feature

IDENT Feature The special feature in the Air Traffic Control Radar Beacon System (ATCRBS) equipment. It is used to immediately distinguish one displayed beacon target from other be>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC