FAA Develops New Tower Siting Procedures | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.13.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Sun, Aug 14, 2005

FAA Develops New Tower Siting Procedures

Move Expected To Enhance Safety, Reduce Costs

By ANN Correspondent Rob Finfrock

"Human factors" are now included in the criteria that the FAA will utilize when determining the placement and height of new air traffic control towers across the country – and the move might save some money, too.

Through a new program that measures air traffic controller visual perspective information, visual performance capability information from the Department of Defense, as well as limits imposed by terminal instrument procedures to determine appropriate airport traffic control tower heights, the FAA has revised its procedure for selecting and designing sites for future towers. 

The FAA expects to see dramatic benefits from their investment of about $150,000 in research into tower siting criteria, including enhanced safety. The recommendations from that research are expected to save the agency an estimated $5 million per year in new tower construction costs, by identifying the optimum height for ATC towers and reducing "overbuilding" costs.

"This achievement in air traffic control siting technology has tremendous immediate and long term implications for both the domestic and international aviation communities," said Charlie Keegan, Vice President for Operations Planning Services of the FAA's Air Traffic Organization. "It will enable tower planners to find and resolve potential problems before tower construction begins. The technology will enhance safety and efficiency, and will save the FAA millions of dollars in tower construction costs in years to come."

Every year, the FAA builds an average of seven new air traffic control towers around the country. Each new tower costs millions of dollars to construct at an average price of $40,000 per foot of height. To ensure that new towers enhance airport and air traffic safety while still being cost effective, FAA human factors and tower simulation specialists researched ways to improve tower siting (height and location) procedures.

FAA human factors specialists from headquarters, Great Lakes Region system analysts and tower simulation specialists at the William J. Hughes Technical Center near Atlantic City, along with specialists from the Army Research Laboratory in Adelphi, Md., developed a methodology to measure the improvement in controller visibility that can be gained by modifying planned tower height at different locations on the airport surface.

The Technical Center's Airport Facilities Tower Integration Laboratory features a unique tower simulation system that can create a 360-degree airport view for any city to evaluate potential tower sites; and determine if clear and unobstructed views of the airport surfaces and approach paths are visible from the various tower control positions. Specialists also have used the system to create realistic simulations of airport traffic control tower environments to address other siting concerns.

FMI: www.faa.gov

Advertisement

More News

Sierra Space Repositions Dream Chaser for First Mission

With Testing Soon Complete, Launch Preparations Begin in Earnest Sierra Space's Dream Chaser has been put through the wringer at NASA's Glenn Armstrong Test Facility in Ohio, but w>[...]

ANN's Daily Aero-Term (05.10.24): Takeoff Roll

Takeoff Roll The process whereby an aircraft is aligned with the runway centerline and the aircraft is moving with the intent to take off. For helicopters, this pertains to the act>[...]

Aero-News: Quote of the Day (05.10.24)

“We’re proud of the hard work that went into receiving this validation, and it will be a welcome relief to our customers in the European Union. We couldn’t be mor>[...]

Aero-News: Quote of the Day (05.11.24)

"Aircraft Spruce is pleased to announce the acquisition of the parts distribution operations of Wag-Aero. Wag-Aero was founded in the 1960’s by Dick and Bobbie Wagner in the >[...]

ANN's Daily Aero-Term (05.11.24): IDENT Feature

IDENT Feature The special feature in the Air Traffic Control Radar Beacon System (ATCRBS) equipment. It is used to immediately distinguish one displayed beacon target from other be>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC