Boeing 747-8 Freighter Receives Expanded Type Inspection Authorization | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Wed, Jun 16, 2010

Boeing 747-8 Freighter Receives Expanded Type Inspection Authorization

First Intercontinental Passenger Fuselage Under Construction In Everett, WA 

The FAA granted expanded type inspection authorization (TIA) to Boeing for the 747-8 Freighter on June 11. This authorization clears the way for FAA personnel to participate in test flights and collect required data.


747-8 Freighter File Image

"This is a major step in our effort to test and certify the 747-8 Freighter for our customers," said Mo Yahyavi, vice president and general manager for the 747 program, Boeing Commercial Airplanes. "The airplane is performing well in the tests. We have demonstrated the airplane's readiness to move onto the next stage in the flight-test program through tests at a variety of speeds, altitudes and configurations."

With the issuance of TIA, the 747 program is beginning expanded certification testing. During this phase of testing, the extremes of the flight envelope are explored. Testing conditions include operations in hot and cold weather as well as takeoffs and landings at high-altitude airports. In addition, over-speed conditions, hard landings and engine-out conditions are tested.

"The airplane is handling beautifully," said Mark Feuerstein, 747 program chief pilot, Boeing Test and Evaluation. "It is a joy to fly."

The entire flight-test program calls for a total of about 3,700 hours of ground and air testing. The first 747-8 Freighter delivery is planned for the fourth quarter of this year.


747-8 Intercontinental Fuselage Assembly

In a related development, Boeing began fuselage assembly of the first 747-8 Intercontinental at the factory in Everett, WA, Monday. Mechanics loaded panels for the 31-foot, 8-inch  long front section of the new airplane into the assembly tool. The panels are part of section 41, the area of the fuselage that houses the flight deck on the upper deck and the forward passenger cabin on the main deck, an area that most airlines typically configure with first class seating.

FMI: www.boeing.com

Advertisement

More News

ANN's Daily Aero-Term (05.09.24): Hold Procedure

Hold Procedure A predetermined maneuver which keeps aircraft within a specified airspace while awaiting further clearance from air traffic control. Also used during ground operatio>[...]

ANN's Daily Aero-Term (05.06.24): Altitude Readout

Altitude Readout An aircraft’s altitude, transmitted via the Mode C transponder feature, that is visually displayed in 100-foot increments on a radar scope having readout cap>[...]

ANN's Daily Aero-Linx (05.06.24)

Aero Linx: European Hang Gliding and Paragliding Union (EHPU) The general aim of the EHPU is to promote and protect hang gliding and paragliding in Europe. In order to achieve this>[...]

Airborne-NextGen 05.07.24: AI-Piloted F-16, AgEagle, 1st 2 WorldView Sats

Also: Skydio Chief, Uncle Sam Sues, Dash 7 magniX, OR UAS Accelerator US Secretary of the Air Force Frank Kendall was given a turn around the patch in the 'X-62A Variable In-flight>[...]

Aero-News: Quote of the Day (05.07.24)

"The need for innovation at speed and scale is greater than ever. The X-62A VISTA is a crucial platform in our efforts to develop, test and integrate AI, as well as to establish AI>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC