Partial Government Shutdown Grounds NASA's SOFIA Airplane | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.13.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Fri, Jan 11, 2019

Partial Government Shutdown Grounds NASA's SOFIA Airplane

Has Been Unable To Fly Since Shutdown Began December 22

The partial government shutdown has forced NASA to stop flying its SOFIA airplane, a modified Boeing 747 which carries a 2.5 meter (8.2-foot) telescope mounted in its fuselage.

The Stratospheric Observatory for Infrared Astronomy (SOFIA) has been grounded since December 22 when the shutdown began, according to Harold Yorke, director of SOFIA science mission operations at the Universities Space Research Association. Speaking at a town hall session held at the 233rd Meeting of the American Astronomical Society (AAS) in Seattle January 8, Yorke apologized to the principal investigators who had been scheduled to fly during the shutdown.

Space News reports that the grounding stands in contrast with NASA's spacecraft missions, which continues operation of "tracking, operation and support" of satellites "for safety and protection of life and property," according to the agency's shutdown plan.

Yorke said that it will take about a week after the shutdown ends for the program to resume flights due to the time needed to prepare the airplane and its instruments. He said at that point, "we will be rethinking the rest of Cycle 6 to see how we can replan and perhaps recover some of this lost time.”

(Image from file)

FMI: Source report

Advertisement

More News

Sierra Space Repositions Dream Chaser for First Mission

With Testing Soon Complete, Launch Preparations Begin in Earnest Sierra Space's Dream Chaser has been put through the wringer at NASA's Glenn Armstrong Test Facility in Ohio, but w>[...]

ANN's Daily Aero-Term (05.10.24): Takeoff Roll

Takeoff Roll The process whereby an aircraft is aligned with the runway centerline and the aircraft is moving with the intent to take off. For helicopters, this pertains to the act>[...]

Aero-News: Quote of the Day (05.10.24)

“We’re proud of the hard work that went into receiving this validation, and it will be a welcome relief to our customers in the European Union. We couldn’t be mor>[...]

Aero-News: Quote of the Day (05.11.24)

"Aircraft Spruce is pleased to announce the acquisition of the parts distribution operations of Wag-Aero. Wag-Aero was founded in the 1960’s by Dick and Bobbie Wagner in the >[...]

ANN's Daily Aero-Term (05.11.24): IDENT Feature

IDENT Feature The special feature in the Air Traffic Control Radar Beacon System (ATCRBS) equipment. It is used to immediately distinguish one displayed beacon target from other be>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC