AD: Pilatus Aircraft Ltd. Airplanes | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.13.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Thu, Jun 06, 2019

AD: Pilatus Aircraft Ltd. Airplanes

AD NUMBER: 2019-10-07

PRODUCT: Pilatus Aircraft Ltd. Models PC-6, PC-6/350, PC-6/350-H1, PC-6/350-H2, PC-6/A, PC-6/A-H1, PC-6/A-H2, PC-6/B-H2, PC-6/B1-H2, PC-6/B2-H2, PC-6/B2-H4, PC-6/C-H2, PC-6/C1-H2, PC-6-H1, and PC-6-H2 airplanes.

ACTION: Final Rule.

SUMMARY: This AD results from mandatory continuing airworthiness information (MCAI) issued by an aviation authority of another country to identify and correct an unsafe condition on an aviation product.

The MCAI describes the unsafe condition as sheared or missing rivets on the horizontal stabilizer hinge bracket assemblies.

DATES: This AD is effective July 10, 2019.

COST: The FAA estimates that this AD will affect 30 products of U.S. registry. Operators may incur the following costs in order to comply with this AD:

The FAA estimates that it will take about 9 work-hours per product to comply with the inspection and placard requirements of this AD. The average labor rate is $85 per work-hour. Required parts will cost about $200 per product.

Based on these figures, the FAA estimates the cost of the inspection and placard requirements on U.S. operators to be $28,950, or $965 per product.
In addition, the FAA estimates the following to do any necessary follow-on actions: Each rivet replacement will take 2 work-hours, fastener replacement will take 3 work-hours, one hinge bracket assembly replacement will take 9 work-hours, and two hinge bracket assembly replacements will take 15 work-hours.

The total estimated cost of parts will be $10,000. The FAA has no way of determining the number of products that may need replacement.

FMI: AD

Advertisement

More News

ANN's Daily Aero-Term (05.10.24): Takeoff Roll

Takeoff Roll The process whereby an aircraft is aligned with the runway centerline and the aircraft is moving with the intent to take off. For helicopters, this pertains to the act>[...]

Aero-News: Quote of the Day (05.10.24)

“We’re proud of the hard work that went into receiving this validation, and it will be a welcome relief to our customers in the European Union. We couldn’t be mor>[...]

Airborne 05.06.24: Gone West-Dick Rutan, ICON BK Update, SpaceX EVA Suit

Also: 1800th E-Jet, Uncle Sam Sues For Landing Gear, Embraer Ag Plane, Textron Parts A friend of the family reported that Lt. Col. (Ret.) Richard Glenn Rutan flew west on Friday, M>[...]

Airborne 05.03.24: Advanced Powerplant Solutions, PRA Runway Woes, Drone Racing

Also: Virgin Galactic, B-29 Doc to Allentown, Erickson Fire-Fighters Bought, FAA Reauthorization After dealing with a big letdown after the unexpected decision by Skyreach to disco>[...]

Aero-News: Quote of the Day (05.11.24)

"Aircraft Spruce is pleased to announce the acquisition of the parts distribution operations of Wag-Aero. Wag-Aero was founded in the 1960’s by Dick and Bobbie Wagner in the >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC