F135 Engine Exceeds 20,000 Test Hours | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Thu, Dec 23, 2010

F135 Engine Exceeds 20,000 Test Hours

All Initial Service Release Development Testing Completed

The F135 engine developed by Pratt & Whithey has surpassed 20,000 test hours as it completes the ground development and demonstration phase of the program. The F135 accumulated 3,600 test hours during the concept demonstration phase, 15,800 test hours during development and more than 700 hours powering the F-35 Lightning II flight test program. In addition, the F135 team has completed all rigorous STOVL testing required to successfully achieve the initial service release milestone.


File Photo

"Pratt & Whitney is proud of the F135's performance in the successful ground and flight test programs," said Bennett Croswell, vice president, Pratt & Whitney F135/F119 Engine Programs. "Exceeding 20,000 test hours while simultaneously powering a successful F-35 flight test program demonstrates the maturity and reliability of the F135 engine for our customers' armed forces around the world."

The F135 is in production and is the only engine powering the F-35 Lightning II flight test program at this time. The conventional take-off and landing (CTOL) engine and STOVL propulsion system have accumulated 510 flights and more than 745 flight test hours. The engine has powered all 12 vertical landings and the company says it is demonstrating excellent reliability, performance and thrust response. 11 production engines have been delivered, including the first production STOVL propulsion systems. 

FMI: www.pratt-whitney.com

Advertisement

More News

ANN's Daily Aero-Term (05.09.24): Hold Procedure

Hold Procedure A predetermined maneuver which keeps aircraft within a specified airspace while awaiting further clearance from air traffic control. Also used during ground operatio>[...]

ANN's Daily Aero-Term (05.06.24): Altitude Readout

Altitude Readout An aircraft’s altitude, transmitted via the Mode C transponder feature, that is visually displayed in 100-foot increments on a radar scope having readout cap>[...]

ANN's Daily Aero-Linx (05.06.24)

Aero Linx: European Hang Gliding and Paragliding Union (EHPU) The general aim of the EHPU is to promote and protect hang gliding and paragliding in Europe. In order to achieve this>[...]

Airborne-NextGen 05.07.24: AI-Piloted F-16, AgEagle, 1st 2 WorldView Sats

Also: Skydio Chief, Uncle Sam Sues, Dash 7 magniX, OR UAS Accelerator US Secretary of the Air Force Frank Kendall was given a turn around the patch in the 'X-62A Variable In-flight>[...]

Aero-News: Quote of the Day (05.07.24)

"The need for innovation at speed and scale is greater than ever. The X-62A VISTA is a crucial platform in our efforts to develop, test and integrate AI, as well as to establish AI>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC