FAA Issues NPRM On Parachute Packing Intervals | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.13.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Tue, May 22, 2007

FAA Issues NPRM On Parachute Packing Intervals

Proposes Change To 180-Day Repacking Timeframe

The Federal Aviation Administration has issued a Notice of Proposed Rulemaking (NPRM), regarding proposed changes to the packing interval for certain types of parachutes.

Currently, the FAA requires that most parachutes may not be used or carried aboard an aircraft and available for emergency use unless they have been packed within the previous 120 days. New reliability data from the parachute industry and other sources indicate it is time to review the packing interval, however, and the FAA is asking for public comment on a proposal to lengthen the interval from 120 to 180 days.

Citing data from the US military and industry representatives, the FAA says the current 120-day packing interval may be too short. Experts assert modern parachute materials last longer when the packing interval is longer than 120 days, and that too-frequent packing may shorten the life of the materials.

Those experts found the parachute's porosity was affected by handling and manipulation of the parachute while being packed. The FAA is proposing 180 days as a more suitable packing interval for modern parachute systems, adding such an extension would also result in a "minor" cost saving for parachutists.

The effect of the proposal is to ensure the rules reflect the safest parachute packing interval. In this rulemaking, the FAA is also proposing several correcting amendments to the rules related to parachute operations.

Comments on the NPRM are due before August 20, 2007.

FMI: Read The Full NPRM

Advertisement

More News

ANN's Daily Aero-Term (05.10.24): Takeoff Roll

Takeoff Roll The process whereby an aircraft is aligned with the runway centerline and the aircraft is moving with the intent to take off. For helicopters, this pertains to the act>[...]

Aero-News: Quote of the Day (05.10.24)

“We’re proud of the hard work that went into receiving this validation, and it will be a welcome relief to our customers in the European Union. We couldn’t be mor>[...]

Airborne 05.06.24: Gone West-Dick Rutan, ICON BK Update, SpaceX EVA Suit

Also: 1800th E-Jet, Uncle Sam Sues For Landing Gear, Embraer Ag Plane, Textron Parts A friend of the family reported that Lt. Col. (Ret.) Richard Glenn Rutan flew west on Friday, M>[...]

Airborne 05.03.24: Advanced Powerplant Solutions, PRA Runway Woes, Drone Racing

Also: Virgin Galactic, B-29 Doc to Allentown, Erickson Fire-Fighters Bought, FAA Reauthorization After dealing with a big letdown after the unexpected decision by Skyreach to disco>[...]

Aero-News: Quote of the Day (05.11.24)

"Aircraft Spruce is pleased to announce the acquisition of the parts distribution operations of Wag-Aero. Wag-Aero was founded in the 1960’s by Dick and Bobbie Wagner in the >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC