AD: Certain Model Cessna 150 Airplanes | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.13.24

Airborne-NextGen-05.14.24

Airborne-Unlimited-05.15.24 Airborne-AffordableFlyers-05.16.24

Airborne-Unlimited-05.17.24

Tue, Aug 30, 2011

AD: Certain Model Cessna 150 Airplanes

AD NUMBER: 2009-10-09 R2

MANUFACTURER: Certain Cessna Aircraft Company (Cessna) Models 150F, 150G, 150H, 150J, 150K, 150L, 150M, A150K, A150L, A150M, F150F, F150G, F150H, F150J, F150K, F150L, F150M, FA150K, FA150L, FRA150L, FA150M, FRA150M, 152, A152, F152, and FA152 airplanes.
SUBJECT: Airworthiness Directive 2009-10-09 R2
ACTION: Final rule; request for comments

SUMMARY: This AD is a revision of an existing airworthiness directive (AD) for Certain Cessna Aircraft Company (Cessna) Models 150F, 150G, 150H, 150J, 150K, 150L, 150M, A150K, A150L, A150M, F150F, F150G, F150H, F150J, F150K, F150L, F150M, FA150K, FA150L, FRA150L, FA150M, FRA150M, 152, A152, F152, and FA152 airplanes. That AD currently requires either installing a placard prohibiting spins and other acrobatic maneuvers in the airplane or replacing the rudder stop, the rudder stop bumper, and the attachment hardware with a rudder stop modification kit. This new AD requires a change to the modification kit and removal of a small amount of material from the rudder horn assembly for those that have not yet complied with the existing AD or for those who can not comply with the existing AD (because they were unable to obtain full rudder travel with the existing kits). This AD was prompted by operators who have reported difficulty in obtaining full rudder travel with the existing modification kit. The FAA is issuing this AD to revise the kits to use longer rivets and allow a small amount of material to be removed from the rudder horn assembly, which allows operators to obtain full rudder travel.

DATES: This AD is effective September 12, 2011

FMI: http://rgl.faa.gov/Regulatory_and_Guidance_Library/rgAD.nsf/0/583392BB4F328C77862578F8004E1580?OpenDocument
 

Advertisement

More News

ANN's Daily Aero-Term (05.16.24): Instrument Runway

Instrument Runway A runway equipped with electronic and visual navigation aids for which a precision or nonprecision approach procedure having straight-in landing minimums has been>[...]

ANN's Daily Aero-Linx (05.16.24)

Aero Linx: Alaska Airmen's Association The Alaska Airmen's Association includes over 2,000 members—we are one of the largest General Aviation communities in the country. We s>[...]

Airborne 05.15.24: Ghost Sq MidAir, B-2 Junked, Dream Chaser Readies

Also: Flt School Security, G600 Steep-Approach, Honduran Aid, PW545D Cert Two aircraft performing at the Fort Lauderdale Air Show clipped wings during a routine last Sunday, spooki>[...]

Airborne 05.10.24: Icon Auction, Drunk MedEvac Pilot, Bell ALFA

Also: SkyReach Parts Support, Piper Service Ctr, Airliner Near-Miss, Airshow London The Judge overseeing Icon's convoluted Chapter 11 process has approved $9 million in Chapter 11 >[...]

Airborne Affordable Flyers 05.16.24: PRA Runway, Wag-Aero Sold, Young Eagles

Also: Paramotor Champ's, Electric Ultralight, ICON BK Update, Burt Rutan at Oshkosh! The Popular Rotorcraft Association is reaching out for help in rebuilding their private runway >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC