NASA Engineers Complete Engine Test Series For Ares I Rocket | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Thu, Aug 21, 2008

NASA Engineers Complete Engine Test Series For Ares I Rocket

Second Of Four Planned J-2X Generator Trials Wraps Up

Engineers at NASA's Marshall Space Flight Center in Huntsville, AL have completed a series of tests on a key component of the J-2X engine which will power the upper stage of the upcoming Ares I rocket.

The test on August 15 was the last of 20 in this series, concluding the second of four planned sets of tests on the J-2X's workhorse gas generator, the driver for the turbopumps which start the engine.

The gas generator test program is designed to demonstrate the component's performance, durability and combustion environment, and to reduce risk in the design, fabrication and operation of flight hardware. The third phase of testing will begin in July 2009. The J-2X's workhorse gas generator is fabricated by Pratt and Whitney Rocketdyne of Canoga Park, CA.

The primary objectives achieved in this series of tests were to regulate ignition timing and address stability issues in the gas chamber. During engine start, a pressurized helium system begins to turn the turbopumps, which draw liquid hydrogen and liquid oxygen propellants into the system. The propellants flow into the generator's combustion chamber, where they are sparked into life by pyrotechnic igniters installed in the side of the main combustion chamber.

Once combustion is initiated, hot gases flow into the turbine. The combustion gas provided by the generator drives the turbomachinery, which delivers high pressure propellants to the main injector during the J-2X burn. This testing allows engineers to address stability issues that can arise during operation of the combustion chamber and will allow engineers to develop a clean design for the J-2X engine.

Beginning in 2015, the Ares I rocket will carry the Orion crew capsule and as many as six astronauts and small payloads to the International Space Station. During the first two-and-a-half minutes of flight, the first stage booster will power the vehicle to an altitude of about 189,000 feet, or 36 miles, at a speed of Mach 4.8. After its propellant is spent, the reusable booster will separate, and the upper stage's J-2X engine will ignite -- powering the Orion to low Earth orbit at an altitude of about 425,328 feet, or roughly 80 miles.

The workhorse gas generator test series is an essential step in development of the J-2X engine. More than 50 tests have been performed on the generator to date. This generator was manufactured to be more durable than the actual generators slated for use in the J-2X engine, allowing it to withstand numerous tests.

The J-2X is an upgraded variant of the storied J-2 rocket engine, which powered the second stage of the Saturn V moon rocket.

FMI: www.nasa.gov/ares, www.nasa.gov/constellation

Advertisement

More News

ANN's Daily Aero-Term (04.24.24): Runway Lead-in Light System

Runway Lead-in Light System Runway Lead-in Light System Consists of one or more series of flashing lights installed at or near ground level that provides positive visual guidance a>[...]

ANN's Daily Aero-Linx (04.24.24)

Aero Linx: Aviation Without Borders Aviation Without Borders uses its aviation expertise, contacts and partnerships to enable support for children and their families – at hom>[...]

Aero-FAQ: Dave Juwel's Aviation Marketing Stories -- ITBOA BNITBOB

Dave Juwel's Aviation Marketing Stories ITBOA BNITBOB ... what does that mean? It's not gibberish, it's a lengthy acronym for "In The Business Of Aviation ... But Not In The Busine>[...]

Classic Aero-TV: Best Seat in The House -- 'Inside' The AeroShell Aerobatic Team

From 2010 (YouTube Version): Yeah.... This IS A Really Cool Job When ANN's Nathan Cremisino took over the lead of our Aero-TV teams, he knew he was in for some extra work and a lot>[...]

Airborne Affordable Flyers 04.18.24: CarbonCub UL, Fisher, Affordable Flyer Expo

Also: Junkers A50 Heritage, Montaer Grows, Dynon-Advance Flight Systems, Vans' Latest Officially, the Carbon Cub UL and Rotax 916 iS is now in its 'market survey development phase'>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC