Ariane 5 Is Set For A September 29 Liftoff | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.13.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Wed, Sep 27, 2017

Ariane 5 Is Set For A September 29 Liftoff

Will Carry Intelsat 37e And BSAT-4a Into Orbit

Arianespace’s ninth launch of 2017 is now scheduled for September 29 on a dual-payload Ariane 5 mission to geostationary transfer orbit with Intelsat 37e (for the global operator Intelsat) and BSAT-4a (for Space Systems Loral in the framework of a turnkey contract for the Japanese operator B-SAT).

Ariane 5 in the Final Assembly BuildingDesignated Flight VA239 in Arianespace’s mission numbering system for its launcher family, the liftoff originally had been set for September 5, but was delayed after the countdown was stopped. An anomaly was detected with an electrical component in one of the Ariane 5 launcher’s two solid boosters, which subsequently was replaced – allowing the launch vehicle’s return to flight status.

Intelsat 37e will be the fourth EpicNG spacecraft orbited by Arianespace to date. Built by Boeing based on the 702MP platform, Intelsat 37e is the first satellite to offer interconnectivity between three different bands. It will deliver high-performance service in C-, Ku- and Ka-bands for use in wireless backhaul, enterprise VSAT and mobility networks.

Flight VA239’s BSAT-4a satellite passenger will be utilized by B-SAT for Direct-to-Home (DTH) television service in Japan. Based on Space Systems Loral’s SSL 1300 platform, BSAT-4a is equipped with 24 Ku-band transponders and will expand the availability of advanced television services such as high definition and 4K/8K ultra-high definition.

(Image provided with Arianespace news release)

FMI: www.arianespace.com

Advertisement

More News

Sierra Space Repositions Dream Chaser for First Mission

With Testing Soon Complete, Launch Preparations Begin in Earnest Sierra Space's Dream Chaser has been put through the wringer at NASA's Glenn Armstrong Test Facility in Ohio, but w>[...]

ANN's Daily Aero-Term (05.10.24): Takeoff Roll

Takeoff Roll The process whereby an aircraft is aligned with the runway centerline and the aircraft is moving with the intent to take off. For helicopters, this pertains to the act>[...]

Aero-News: Quote of the Day (05.10.24)

“We’re proud of the hard work that went into receiving this validation, and it will be a welcome relief to our customers in the European Union. We couldn’t be mor>[...]

Aero-News: Quote of the Day (05.11.24)

"Aircraft Spruce is pleased to announce the acquisition of the parts distribution operations of Wag-Aero. Wag-Aero was founded in the 1960’s by Dick and Bobbie Wagner in the >[...]

ANN's Daily Aero-Term (05.11.24): IDENT Feature

IDENT Feature The special feature in the Air Traffic Control Radar Beacon System (ATCRBS) equipment. It is used to immediately distinguish one displayed beacon target from other be>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC