Boeing To Provide Airport And Airspace Modeling Services In Turkey | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Sun, Jun 26, 2016

Boeing To Provide Airport And Airspace Modeling Services In Turkey

Jeppesen TAAM Solution To Assist In Development Of Istanbul New Airport Airspace Design

Boeing has announced a new Technical Assistance Agreement with iGA Havalimani Isletmesi A.S. (IGA), the developer and operator of Istanbul New Airport.

Through the agreement, Boeing subsidiary Jeppesen will provide its Total Airport and Airspace Modeler (TAAM) solution to assist IGA and DHMI, Turkey’s General Directorate of State Airports Authority. This group will support the development of Istanbul New Airport airspace design, the airport operation optimization program and an operational readiness plan.

“We look forward to working with IGA and DHMI to find the most effective operational concepts for the Istanbul area, as part of the overall investment in the infrastructure of Turkish aerospace,” said Aysem Sargin, managing director of Boeing Turkey. “Using our TAAM tool, we will be able to show the impacts of all operational concepts and assist the Istanbul New Airport team to make the most informed decisions possible for the new airport.”

The state of the art Jeppesen TAAM analysis tool will be used with the IGA and DHMI teams to conduct studies that would potentially maximize Istanbul New Airport runway operations and overall airspace capacity and efficiency. Maintaining safety and minimizing airspace conflict within the regional Istanbul Terminal Control Area is another key aspect of the project.

Several operational procedure alternatives will be simulated and analyzed by TAAM to assist the new airport’s airspace and runway optimization process. Both IGA and DHMI will be trained to use the TAAM solution, allowing active participation in the project, as well as the ability to conduct their own continuing analysis projects, following the successful delivery of Jeppesen’s analysis.

(Source: Boeing news release)

FMI: www.boeing.com

Advertisement

More News

Airbus Racer Helicopter Demonstrator First Flight Part of Clean Sky 2 Initiative

Airbus Racer Demonstrator Makes Inaugural Flight Airbus Helicopters' ambitious Racer demonstrator has achieved its inaugural flight as part of the Clean Sky 2 initiative, a corners>[...]

Diamond's Electric DA40 Finds Fans at Dübendorf

A little Bit Quieter, Said Testers, But in the End it's Still a DA40 Diamond Aircraft recently completed a little pilot project with Lufthansa Aviation Training, putting a pair of >[...]

ANN's Daily Aero-Term (04.23.24): Line Up And Wait (LUAW)

Line Up And Wait (LUAW) Used by ATC to inform a pilot to taxi onto the departure runway to line up and wait. It is not authorization for takeoff. It is used when takeoff clearance >[...]

NTSB Final Report: Extra Flugzeugbau GMBH EA300/L

Contributing To The Accident Was The Pilot’s Use Of Methamphetamine... Analysis: The pilot departed on a local flight to perform low-altitude maneuvers in a nearby desert val>[...]

Classic Aero-TV: 'Never Give Up' - Advice From Two of FedEx's Female Captains

From 2015 (YouTube Version): Overcoming Obstacles To Achieve Their Dreams… At EAA AirVenture 2015, FedEx arrived with one of their Airbus freight-hauling aircraft and placed>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC