AD: Airbus SAS Airplanes | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.13.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Fri, Aug 23, 2019

AD: Airbus SAS Airplanes

AD NUMBER: 2019-14-03

PRODUCT: Certain Airbus SAS Model A318, A319, A320, and A321 series airplanes.

ACTION: Final Rule.

SUMMARY: The FAA is superseding Airworthiness Directive (AD) 2016-07-12, which applied to the aircraft listed above.

AD 2016-07-12 required repetitive inspections for damage and cracking of the aft fixed fairing (AFF) of the pylons, and repair if necessary.

This AD retains the requirements of AD 2016-07-12 and requires additional repetitive inspections at the upper spar at a certain rib area and corrective actions if necessary, as specified in an European Aviation Safety Agency (EASA) AD, which is incorporated by reference.

This AD was prompted by reports of cracking of the AFF of the pylons due to fatigue damage of the structure and reports of cracks on a certain rib of a modified AFF of the pylons.

DATES: This AD is effective September 26, 2019.

COST: The FAA estimates that this AD affects 205 airplanes of U.S. registry. Operators may incur the following costs in order to comply with this AD:

Required Actions

  • Retained actions from AD 2016-07-12 4 work-hours × $85 per hour = $340 per aircraft.
  • New proposed actions Up to 21 work-hours × $85 per hour = Up to $1,785 per aircraft.

Estimated Costs for Optional Actions

  • Labor: Up to 70 work-hours × $85 per hour = Up to $5,950 per aircraft
  • Parts: Up to $32,800
  • Cost per Aircraft: Up to $38,750
FMI: AD

Advertisement

More News

Sierra Space Repositions Dream Chaser for First Mission

With Testing Soon Complete, Launch Preparations Begin in Earnest Sierra Space's Dream Chaser has been put through the wringer at NASA's Glenn Armstrong Test Facility in Ohio, but w>[...]

ANN's Daily Aero-Term (05.10.24): Takeoff Roll

Takeoff Roll The process whereby an aircraft is aligned with the runway centerline and the aircraft is moving with the intent to take off. For helicopters, this pertains to the act>[...]

Aero-News: Quote of the Day (05.10.24)

“We’re proud of the hard work that went into receiving this validation, and it will be a welcome relief to our customers in the European Union. We couldn’t be mor>[...]

Aero-News: Quote of the Day (05.11.24)

"Aircraft Spruce is pleased to announce the acquisition of the parts distribution operations of Wag-Aero. Wag-Aero was founded in the 1960’s by Dick and Bobbie Wagner in the >[...]

ANN's Daily Aero-Term (05.11.24): IDENT Feature

IDENT Feature The special feature in the Air Traffic Control Radar Beacon System (ATCRBS) equipment. It is used to immediately distinguish one displayed beacon target from other be>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC