AD: Airbus Airplanes | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.13.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Tue, Apr 03, 2018

AD: Airbus Airplanes

AD NUMBER: 2018-06-04

PRODUCT: Certain Airbus Model A320-111, -211, -212, and -231 series airplanes.

ACTION: Final Rule.

SUMMARY: The FAA is superseding Airworthiness Directive (AD) 2004-03-07, which applied to the aircraft listed above AD 2004-03-07 required repetitive inspections for fatigue cracking around the fasteners attaching the pressure panel to the flexible bracket at a certain frame (FR), adjacent to the longitudinal beams on the left and right sides of the airplane; and repair as necessary.

This new AD retains certain requirements of AD 2004-03-07, expands the applicability, and requires an inspection of the fastener holes on the pressure panel and modification or repair as applicable.

This AD was prompted by fatigue tests which revealed cracking around the fasteners attaching the pressure panel to the flexible bracket, and by the discovery of additional cracks under the longitudinal beams at locations that are not included in the inspection area required by AD 2004-03-07.

DATES: This AD is effective May 3, 2018.

COST: The FAA estimates that this AD affects 737 airplanes of U.S. registry. The cost of compliance is estimated as follows:

  • Inspection [Retained from AD 2004-03-07]: Up to 2 work-hours × $85 per hour = $170 per inspection cycle.
  • Inspection [new proposed requirement]: 13 work-hours × $85 per hour = $1,105.
  • Modification (if necessary): Up to 213 work-hours × $85 per hour = $18,105 Parts are estimated to cost up to $8,510, for a total cost per airplane at up to $26,615.
FMI: AD

Advertisement

More News

Sierra Space Repositions Dream Chaser for First Mission

With Testing Soon Complete, Launch Preparations Begin in Earnest Sierra Space's Dream Chaser has been put through the wringer at NASA's Glenn Armstrong Test Facility in Ohio, but w>[...]

ANN's Daily Aero-Term (05.10.24): Takeoff Roll

Takeoff Roll The process whereby an aircraft is aligned with the runway centerline and the aircraft is moving with the intent to take off. For helicopters, this pertains to the act>[...]

Aero-News: Quote of the Day (05.10.24)

“We’re proud of the hard work that went into receiving this validation, and it will be a welcome relief to our customers in the European Union. We couldn’t be mor>[...]

Aero-News: Quote of the Day (05.11.24)

"Aircraft Spruce is pleased to announce the acquisition of the parts distribution operations of Wag-Aero. Wag-Aero was founded in the 1960’s by Dick and Bobbie Wagner in the >[...]

ANN's Daily Aero-Term (05.11.24): IDENT Feature

IDENT Feature The special feature in the Air Traffic Control Radar Beacon System (ATCRBS) equipment. It is used to immediately distinguish one displayed beacon target from other be>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC