C-130 AMP Prepares For USAF Test And Evaluation | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Mon, Jun 27, 2011

C-130 AMP Prepares For USAF Test And Evaluation

Five C-130 Avionics Modernization Program Aircraft Will Fly In IOT&E Program

Final preparations are underway for five C-130 aircraft to enter Boeing's Avionics Modernization Program (AMP). The U.S. Air Force Initial Operational Test and Evaluation (IOT&E) program is set to begin in early 2012.

"Once evaluation is complete in late 2012, we will have a fully tested and proven weapon system that will offer more situational awareness for aircrews, increasing flight safety during their many mission types," said Mahesh Reddy, C-130 AMP program director for Boeing.
 
Three AMP aircraft have been in scheduled programmed depot maintenance at Warner Robins Air Logistics Center, Ga., over the past year. Two of these aircraft received final software and hardware upgrades at Boeing's Flight Test Operations facility in Palmdale, bringing them up to production configuration. The first of these was delivered to Little Rock Air Force Base, AR, on April 23, and the second was delivered on May 16. The third aircraft is receiving final upgrades at Edwards Air Force Base, Calif. It will be delivered to Little Rock in July.

The first two low-rate initial production C-130 AMP aircraft were inducted at Warner Robins in August 2010. These aircraft will be completed in late 2011 and early 2012 and then will join the three other aircraft in the IOT&E program at Little Rock Air Force Base.

"The Little Rock 'schoolhouse' for C-130 AMP is now training flight crews," said Lt. Col. Kevin Tebbutt, Chief of Operations and Training, 189th Operations Group. "Our crewmembers are currently in the academic and simulator phase of training. The initial cadre of AMP instructors is flying the AMP aircraft we have on the ramp to prepare for the students that will start their flight line training in June."

FMI: www.boeing.com, www.af.mil

Advertisement

More News

ANN's Daily Aero-Term (05.07.24): Hazardous Weather Information

Hazardous Weather Information Summary of significant meteorological information (SIGMET/WS), convective significant meteorological information (convective SIGMET/WST), urgent pilot>[...]

ANN's Daily Aero-Linx (05.07.24)

Aero Linx: The T-6 Racing Association The T-6 Racing Association is all about T-6‘s and racing. Our mission is to bring great racing to our fans in Reno and other venues wher>[...]

Airborne 05.01.24: WACO Kitchen, FAA Reauthorization, World Skydiving Day

Also: Electra Aero, AMO-CBP v Smugglers, Naval King Airs, Boeing Deal To the surprise of everyone involved, Waco Kitchen shut down both airport operations with little warning and h>[...]

Airborne Affordable Flyers 05.02.24: Bobby Bailey, SPRG Report Cards, Skydive!

Also: WACO Kitchen Bails, French SportPlane Mfr to FL, Dynon-Advance Flight Systems, Innovation Preview Bobby Bailey, a bit of a fixture in sport aviation circles for his work with>[...]

Airborne 05.03.24: Advanced Powerplant Solutions, PRA Runway Woes, Drone Racing

Also: Virgin Galactic, B-29 Doc to Allentown, Erickson Fire-Fighters Bought, FAA Reauthorization After dealing with a big letdown after the unexpected decision by Skyreach to disco>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC