AD: Rolls-Royce plc Turbofan Engines | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.13.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Mon, Jul 10, 2017

AD: Rolls-Royce plc Turbofan Engines

AD NUMBER: 2017-10-19

PRODUCT: Certain Rolls-Royce plc (RR) Trent 1000-A2, Trent 1000-C2, Trent 1000-D2, Trent 1000-E2, Trent 1000-G2, Trent 1000-H2, Trent 1000-J2, Trent 1000-K2, and Trent 1000-L2 turbofan engines.

ACTION: Final Rule; request for comments

SUMMARY: This AD requires initial and repetitive on-wing inspections of affected intermediate pressure compressor (IPC) rotor seals.

This AD was prompted by a failure of the IPC rotor seal. The European Aviation Safety Agency (EASA), which is the Technical Agent for the Member States of the European Community, has issued EASA AD 2017-0017, dated February 1, 2017 (referred to hereinafter as "the MCAI"), to correct an unsafe condition for the specified products.

The MCAI states: "Recently, a low speed abort (60 to 65 knots) occurred on take-off on a Trent 1000-powered Boeing 787 aeroplane. The pilot performed a commanded engine shutdown and the aeroplane safely returned to the gate.

Following investigation, failure and release of the intermediate pressure compressor (IPC) rotor seal was confirmed as having caused this event. RR have confirmed that other IPC rotor seals, Part Number (P/N) KH19098, have been found with cracking at the seal head. This condition, if not detected and corrected, could lead to engine power loss, possibly resulting in reduced control of the airplane."

The FAA estimates that this AD affects 0 engines installed on airplanes of U.S. registry.

DATES: This AD becomes effective July 20, 2017. Comments on this AD must be received by August 21, 2017.

FMI: AD

Advertisement

More News

Sierra Space Repositions Dream Chaser for First Mission

With Testing Soon Complete, Launch Preparations Begin in Earnest Sierra Space's Dream Chaser has been put through the wringer at NASA's Glenn Armstrong Test Facility in Ohio, but w>[...]

ANN's Daily Aero-Term (05.10.24): Takeoff Roll

Takeoff Roll The process whereby an aircraft is aligned with the runway centerline and the aircraft is moving with the intent to take off. For helicopters, this pertains to the act>[...]

Aero-News: Quote of the Day (05.10.24)

“We’re proud of the hard work that went into receiving this validation, and it will be a welcome relief to our customers in the European Union. We couldn’t be mor>[...]

Aero-News: Quote of the Day (05.11.24)

"Aircraft Spruce is pleased to announce the acquisition of the parts distribution operations of Wag-Aero. Wag-Aero was founded in the 1960’s by Dick and Bobbie Wagner in the >[...]

ANN's Daily Aero-Term (05.11.24): IDENT Feature

IDENT Feature The special feature in the Air Traffic Control Radar Beacon System (ATCRBS) equipment. It is used to immediately distinguish one displayed beacon target from other be>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC