AD: Pilatus Aircraft Ltd. Airplanes | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-09.16.24

Airborne-NextGen-09.17.24

Airborne-Unlimited-09.18.24

Airborne-FlightTraining-09.19.24

Airborne-Unlimited-09.20.24

Sat, Oct 08, 2022

AD: Pilatus Aircraft Ltd. Airplanes

AD 2022-19-03 Requires Incorporating New Revisions To The ALS Of The Existing Airplane Maintenance Manual

The FAA is superseding Airworthiness Directive (AD) 2016-26-08, which applied to all Pilatus Aircraft Ltd. Model PC-12, PC-12/45, PC-12/47, and PC-12/47E airplanes.

AD 2016-26-08 required incorporating revisions into the airworthiness limitations section (ALS) of the maintenance program and inspecting the main landing gear (MLG) attachment bolts for cracks and corrosion. Since the FAA issued AD 2016-26-08, the European Union Aviation Safety Agency (EASA) superseded its mandatory continuing airworthiness information (MCAI) to add a new life limit for certain MLG actuator bottom attachment bolts and then superseded it again to add new life limits for the rudder bellcrank. This AD requires incorporating new revisions to the ALS of the existing airplane maintenance manual (AMM) or Instructions for Continued Airworthiness (ICA) to establish a 5-year life limit for certain MLG actuator bottom attachment bolts and new life limits for the rudder bellcrank. The FAA is issuing this AD to address the unsafe condition on these products. This AD is effective October 27, 2022.

Supplementary Information: The FAA issued a notice of proposed rulemaking (NPRM) to amend 14 CFR part 39 to supersede AD 2016-26-08, Amendment 39-18766 (82 FR 1172, January 5, 2017; corrected February 16, 2017, 82 FR 10859) (AD 2016-26-08). AD 2016-26-08 applied to all Pilatus Aircraft Ltd. (Pilatus) Model PC-12, PC-12/45, PC-12/47, and PC-12/47E airplanes. AD 2016-26-08 required incorporating revisions into the ALS of the existing FAA-approved maintenance program and inspecting the MLG attachment bolts for cracks and corrosion.

The NPRM published in the Federal Register on March 14, 2022 (87 FR 14187). The NPRM was prompted by reports of failure of MLG actuator bottom attachment bolts, part number 532.10.12.218, identified with “VLG” on the bolt head. These parts are from a specific vendor and are subject to hydrogen embrittlement. Accordingly, EASA, which is the Technical Agent for the Member States of the European Union, superseded its prior AD on this condition and issued EASA AD 2021-0005, dated January 7, 2021, corrected January 14, 2021, to require a new 5-year life limit for the MLG actuator bottom attachment bolt identified with “VLG.” Pilatus subsequently added new life limits for the rudder bellcrank. As a result, EASA superseded its AD again and issued AD 2021-0214, dated September 17, 2021 (referred to after this as “the MCAI”).

The MCAI states:

  • The airworthiness limitations and certification maintenance instructions for Pilatus PC-12 aeroplanes, which are approved by EASA, are currently defined and published in Pilatus PC-12 AMM Chapter 04-00-00. These instructions have been identified as mandatory for continued airworthiness.
  • Failure to accomplish these instructions could result in an unsafe condition.
  • Previously, EASA issued [EASA] AD 2021-0005, requiring the actions described in the Pilatus PC-12 AMM Chapter 04-00-00, Document Number 02049 Issue 01 Revision 40, Document Number 02300 Issue 01 Revision 24 and Document Number 02436 Issue 01 Revision 02.
  • Since that [EASA] AD was issued, Pilatus published the applicable ALS, as defined in this [EASA] AD, which contains new and/or more restrictive tasks and limitations, as specified in the Component Limitations section, to introduce a new life limit for the rudder bellcrank. Due to the introduction of this life limit, the repetitive eddy current inspections are no longer required and deleted from the Supplemental Structural Inspection section.
  • For the reason described above, this [EASA] AD retains the requirements of EASA AD 2021-0005, which is superseded, and requires accomplishment of the actions as specified in the applicable ALS.

You may examine the MCAI at regulations.gov by searching for and locating Docket No. FAA-2022-0153.

In the NPRM, the FAA proposed to require incorporating new revisions to the ALS of the existing AMM or ICA to establish a 5-year life limit for certain MLG actuator bottom attachment bolts and new life limits for the rudder bellcrank. The FAA is issuing this AD to prevent MLG collapse during all phases of airplane operations, including take-off and landing, and also to prevent rudder bellcrank failure, which could lead to loss of airplane control.

FMI: www.regulations.gov

Advertisement

More News

ANN's Daily Aero-Term (09.17.24): Instrument Approach Procedure (IAP) Charts

Instrument Approach Procedure (IAP) Charts Portray the aeronautical data which is required to execute an instrument approach to an airport. These charts depict the procedures, incl>[...]

Aero-News: Quote of the Day (09.17.24)

“Our industry is approaching a 30-year innovation cycle, and we have less than 25 years to decarbonize aviation. We need to develop new methods to get net zero aerospace tech>[...]

Airborne 09.16.24: Bristell Shooting, EAA v FAA, Boeing Strike!

Also: Girls in Aviation Day, B-29 Doc Heads 4 Chino, C-17 Tail Cone Detaches, Bulgaria Airshow Accident One of two private aircraft that launched from Apatity Airport near Murmansk>[...]

Classic Aero-TV: CubCrafters NX Cub-A Stunning Effort To Build The ‘Perfect Cub'

From 2021 (YouTube Version): We Were Blown Away At How Well The Nosewheel Was Adapted To The X Cub Airframe It should not be a secret to any one of you, that with thousands of hour>[...]

Airborne 09.18.24: Boom XB-1 3rd Test, DJI Ban, SubSonex To EAA Museum

Also: Volato Nixed by Honda, New B-21 Bases, A-10 Unit Inactivated, Gogo/Airshare Boom Supersonic announced its demonstrator aircraft XB-1 successfully completed its third test fli>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC