Why Did NASA Push So Hard? | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.13.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Thu, Jul 14, 2005

Why Did NASA Push So Hard?

Day After Launch Scrub, Space Agency Criticized For Speeding Preps

With the shuttle program under the world's microscope as it returns to flight, why did NASA engineers start the countdown without checking the external fuel tank’s sensors? Those sensors were already pegged as problematic when NASA delayed the launch in April. The answer: engineers said they were comfortable that the issue was nothing more than an “unexplained anomaly.”

"We became comfortable as a group, as a management team, that this was an acceptable posture to go fly in," deputy shuttle program manager Wayne Hale said, quoted by the Associated Press, "and we also knew that if something were to happen during a launch countdown, we would do this test and we would find it. And guess what? We did the test, we found something and we stopped. We took no risk. We're not flying with this."

The fuel depletion sensor failure that stopped Wednesday’s launch was one of two issues that caused NASA officials some measure of embarrassment during the launch scrub. Earlier, a plastic windowpane simply fell out of the space vehicle, damaging some of Discovery’s sensitive thermal tiles.

Discovery will not launch until at least Saturday -- a delay that could run much longer. At this point, it’s not clear whether the shuttle can be repaired on the pad or will have to be returned to the Vehicle Assembly Building.

FMI: www.nasa.gov

Advertisement

More News

Sierra Space Repositions Dream Chaser for First Mission

With Testing Soon Complete, Launch Preparations Begin in Earnest Sierra Space's Dream Chaser has been put through the wringer at NASA's Glenn Armstrong Test Facility in Ohio, but w>[...]

ANN's Daily Aero-Term (05.10.24): Takeoff Roll

Takeoff Roll The process whereby an aircraft is aligned with the runway centerline and the aircraft is moving with the intent to take off. For helicopters, this pertains to the act>[...]

Aero-News: Quote of the Day (05.10.24)

“We’re proud of the hard work that went into receiving this validation, and it will be a welcome relief to our customers in the European Union. We couldn’t be mor>[...]

Aero-News: Quote of the Day (05.11.24)

"Aircraft Spruce is pleased to announce the acquisition of the parts distribution operations of Wag-Aero. Wag-Aero was founded in the 1960’s by Dick and Bobbie Wagner in the >[...]

ANN's Daily Aero-Term (05.11.24): IDENT Feature

IDENT Feature The special feature in the Air Traffic Control Radar Beacon System (ATCRBS) equipment. It is used to immediately distinguish one displayed beacon target from other be>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC