NASA Glenn Ships Off Ares I-X Test Rocket Segments | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Thu, Oct 23, 2008

NASA Glenn Ships Off Ares I-X Test Rocket Segments

First Flight Slated For Next Year

NASA's next-generation rocket system is finally hitting the road... a necessary step before it can reach for the stars. On Wednesday, full-scale components for the Ares I-X test rocket left the hangars of NASA's Glenn Research Center in Cleveland, bound for a Wellsville port along the Ohio River... and, ultimately, Kennedy Space Center in Florida.

WKYC-3 reports 11 segments of the Ares I-X rocket will make the journey to KSC, where they will be assembled with other components. The completed test rocket is scheduled to launch in summer 2009.

In addition to being a milestone accomplishment for NASA, the rocket parts also mark the first time NASA Glenn has manufactured components for a full-scale launch vehicle in 20 years... an accomplishment noted by Joe Roman, president and CEO of the Greater Cleveland Partnership.

"The GCP is pleased to congratulate the NASA Glenn Research Center (GRC) and its employees on the occasion of shipping the first major hardware pieces of the Ares I-X vehicle that will simulate the Ares I vehicle, the replacement for the space shuttle," said Roman. "This is another key example of the kind of innovative technology that is developed here in Northeast Ohio.

"Today is about the future of manned space flight and the future of NASA Glenn," he continued. "GRC continues to demonstrate its commitment and ability to contribute to the Space Exploration Mission. From design to fabrication, as well as testing of components of the upper-stage mass simulator, spacecraft adapter, service module, and interstage section, GRC is moving NASA and our nation to the next level of space exploration."

FMI: www.nasa.gov/ares/, www.grc.nasa.gov/

Advertisement

More News

Aero-News: Quote of the Day (05.09.24)

"Fly-by-wire flight, coupled with additional capability that are being integrated into ALFA, provide a great foundation for Bell to expand on its autonomous capabilities. This airc>[...]

ANN's Daily Aero-Term (05.09.24): Hold Procedure

Hold Procedure A predetermined maneuver which keeps aircraft within a specified airspace while awaiting further clearance from air traffic control. Also used during ground operatio>[...]

ANN's Daily Aero-Linx (05.09.24)

Aero Linx: B-21 Raider The B-21 Raider will be a dual-capable penetrating strike stealth bomber capable of delivering both conventional and nuclear munitions. The B-21 will form th>[...]

Airborne 05.03.24: Advanced Powerplant Solutions, PRA Runway Woes, Drone Racing

Also: Virgin Galactic, B-29 Doc to Allentown, Erickson Fire-Fighters Bought, FAA Reauthorization After dealing with a big letdown after the unexpected decision by Skyreach to disco>[...]

Airborne-NextGen 05.07.24: AI-Piloted F-16, AgEagle, 1st 2 WorldView Sats

Also: Skydio Chief, Uncle Sam Sues, Dash 7 magniX, OR UAS Accelerator US Secretary of the Air Force Frank Kendall was given a turn around the patch in the 'X-62A Variable In-flight>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC