AD: Bombardier, Inc., Airplanes | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Recent Daily Episodes

Episode Date

Airborne Unlimited-
Monday

Airborne Unmanned-
Alt. Wednesdays

Airborne Flight Training-Alt. Wednesdays

Airborne Unlimited-
Friday

Airborne Special Programs!

Airborne On ANN

Airborne Unlimited--05.27.20

Airborne-Unmanned--05.28.20

NEW! Airborne-Flight Training--05.20.20

Airborne Unlimited--05.29.20

Airborne's Annual April 1st Episode

Airborne-YouTube

Airborne Unlimited--05.27.20

Airborne-Unmanned--05.28.20

NEW! Airborne-Flight Training--05.20.20

Airborne Unlimited--05.29.20

The 2020 Avionics Innovation Preview!

Tue, Jun 12, 2018

AD: Bombardier, Inc., Airplanes

AD NUMBER: 2018-11-12

PRODUCT: All Bombardier, Inc., Model CL-600-2C10 (Regional Jet Series 700, 701, & 702) airplanes, Model CL-600-2D15 (Regional Jet Series 705) airplanes, Model CL-600-2D24 (Regional Jet Series 900) airplanes, and Model CL-600- 2E25 (Regional Jet Series 1000) airplanes.

ACTION: Final Rule.

SUMMARY: This AD was prompted by a report that Belleville washers installed on the shimmy damper of the main landing gear (MLG) may fail due to fatigue.

This AD requires revising the maintenance or inspection program, as applicable, to incorporate a repetitive task specified in the maintenance review board (MRB) report.

DATES: This AD is effective July 12, 2018.

COST: The FAA estimates that this AD affects 544 airplanes of U.S. registry.

The FAA has determined that revising the maintenance or inspection program takes an average of 90 work-hours per operator, although we recognize that this number may vary from operator to operator.

In the past, the FAA has estimated that this action takes 1 work-hour per airplane. Since operators incorporate maintenance or inspection program changes for their affected fleet(s), the FAA has determined that a per-operator estimate is more accurate than a per-airplane estimate. Therefore the total cost per operator to be $7,650 (90 work-hours x $85 per work-hour).

FMI: AD

Advertisement

More News

FAA Grants NATA Requested Extension on Crewmember Relief

Two Exemptions Are Available To All Part 119 Certificated Carriers Operating Under Part 135 The FAA has granted a NATA request for an extension to exemptions regarding certain crew>[...]

Maintaining Aero-History: Spirit of B-26 Marauder Lives On At Barksdale AFB

B-52 Stratofortress Named After The Record-Setting B-26 When World War II ended in 1945, a Martin B-26 Marauder named Flak-Bait had flown 207 missions — more than any other U>[...]

CBP Monitored MN Unrest Via Predator

Predator Spotted Over Minneapolis After Surveiling US Border With Canada A number of soruces created a bit of a fuss when they notred that a CBP Predtor was operating over Minneapo>[...]

Aero-News: Quote of the Day (06.01.20)

"It is with great disappointment that due to the rigid Covid-19 restrictions imposed by Governor Pritzker and the State of Illinois, the 2020 TBM Avenger Reunion and Salute to Vete>[...]

Klyde Morris (06.01.20)

Hey... Ya Gotta Pay For This Space Stuff Somehow... FMI: www.klydemorris.com>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2020 Web Development & Design by Pauli Systems, LC