Lockheed Martin Will Build T-50A At South Carolina Facility | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Wed, May 25, 2016

Lockheed Martin Will Build T-50A At South Carolina Facility

Aircraft Being Offered As T-38 Replacement

As the U.S. Air Force works toward replacing the T-38 Talon as its primary jet trainer, Lockheed Martin's Greenville, SC facility is prepping to build the T-50A, which the company will offer as the replacement for the T-38.

The Talon is in its fifth decade of training Air Force pilots. LMC announced back in February that it would be offering the T-50A in the U.S. Air Force’s Advanced Pilot Training (APT) competition. The T-50A was developed jointly by Lockheed Martin and Korea Aerospace Industries (KAI). At the same time, the company said that the Greenville plant was the preferred Final Assembly and Checkout (FACO) site for the T-50A.

“The T-50A is production ready now. It is the only offering that meets all of the APT requirements and can deliver those capabilities on schedule,” Rob Weiss, executive vice president and general manager, Lockheed Martin Advanced Development Programs (Skunk Works), said in a news release in February. “We carefully studied a clean-sheet option for the [Advanced Pilot Training] competition and determined that it posed excessive risk to the APT cost and schedule requirements.”

The Columbia Business Report indicates that the company has started converting Hangar 11 at the Greenville facility for production of the T-50A. The building was originally constructed in 1958, and Don Erickson, site director for Lockheed Martin’s Greenville operations facility located at the S.C. Technology and Aviation Center, said that the conversion would include a new interior roof, office spaces, and fresh paint on the floor. If Lockheed Martin wins the $10 to $11 billion contract, it would produce four aircraft per month at the Greenville facility.

The Air Force is expected to announce the winner of the competition in late 2017 or early 2018.

(Images provided by Lockheed Martin)

FMI: http://www.lockheedmartin.com/us/products/t50A.html

Advertisement

More News

ANN's Daily Aero-Term (04.25.24): Airport Rotating Beacon

Airport Rotating Beacon A visual NAVAID operated at many airports. At civil airports, alternating white and green flashes indicate the location of the airport. At military airports>[...]

ANN's Daily Aero-Linx (04.25.24)

Aero Linx: Fly for the Culture Fly For the Culture, Inc. is a 501(c)(3) non-profit organization that serves young people interested in pursuing professions in the aviation industry>[...]

Klyde Morris (04.22.24)

Klyde Is Having Some Issues Comprehending The Fed's Priorities FMI: www.klydemorris.com>[...]

Airborne 04.24.24: INTEGRAL E, Elixir USA, M700 RVSM

Also: Viasat-uAvionix, UL94 Fuel Investigation, AF Materiel Command, NTSB Safety Alert Norges Luftsportforbund chose Aura Aero's little 2-seater in electric trim for their next gli>[...]

Airborne 04.22.24: Rotor X Worsens, Airport Fees 4 FNB?, USMC Drone Pilot

Also: EP Systems' Battery, Boeing SAF, Repeat TBM 960 Order, Japan Coast Guard H225 Buy Despite nearly 100 complaints totaling millions of dollars of potential fraud, combined with>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC