First Flight: E-2D Advanced Hawkeye With New Aerial Refueling Capability | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-Unlimited-04.23.24

Airborne-Unlimited-04.24.24 Airborne-FltTraining-04.25.24

Airborne-Unlimited-04.26.24

Tue, Dec 20, 2016

First Flight: E-2D Advanced Hawkeye With New Aerial Refueling Capability

Will Give Aircraft Greater Range, Extend Mission Times

Northrop Grumman has successfully completed the first flight of an E-2D Advanced Hawkeye equipped with aerial refueling (AR).

Under a 2013 engineering, manufacturing, and development (EMD) contract award, Northrop Grumman designed, developed, manufactured, and tested several sub-system upgrades necessary to accommodate an aerial refueling capability.

“The Northrop Grumman aerial refueling team continues to put outstanding effort into bringing this much-needed capability to the E-2D Advanced Hawkeye and our warfighters who rely on it,” said Capt. Keith Hash, program manager, E-2/C-2 Airborne Tactical Data System Program Office (PMA-231).

The aerial refueling capability will allow the E-2D to provide longer on-station times at greater ranges, extending its mission time to better support the warfighter.

The upgrades installed to support aerial refueling include probe and associated piping, electrical and lighting upgrades, and long endurance seats that will enhance field of view in the cockpit and reduce fatigue over longer missions.

“First flight is an exciting day in the journey from concept to an aerial refueling equipped E-2D,” said Jane Bishop, vice president, E-2/C-2 programs, Northrop Grumman. “This takes the E-2D to another level, which will bring more combat persistence to the U.S. and our allies.”

The aerial refueling program will modify three aircraft for testing planned through 2018. Production cut-in and retrofit plans are scheduled to begin in 2018.

(Images provided with Northrop Grumman news release)

FMI: www.northropgrumman.com

Advertisement

More News

ANN's Daily Aero-Term (04.26.24): DETRESFA (Distress Phrase)

DETRESFA (Distress Phrase) The code word used to designate an emergency phase wherein there is reasonable certainty that an aircraft and its occupants are threatened by grave and i>[...]

Aero-News: Quote of the Day (04.26.24)

"General aviation is at the forefront of developing and introducing innovative technologies that will transform the entire aviation industry..." Source: Kyle Martin, Vice President>[...]

ANN's Daily Aero-Term (04.27.24): Direct

Direct Straight line flight between two navigational aids, fixes, points, or any combination thereof. When used by pilots in describing off-airway routes, points defining direct ro>[...]

ANN's Daily Aero-Linx (04.27.24)

Aero Linx: Women in Corporate Aviation Women in Corporate Aviation support individuals seeking career advancement and professional development in the business aviation industry. Me>[...]

Aero-News: Quote of the Day (04.27.24)

“We would like to thank the many volunteers that help throughout the year to pull off the event, as well as the several reviewers, judges, and SURVICE staff that provide team>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC