ISS Spacewalkers Investigate Station Power Woes | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-Unlimited-04.23.24

Airborne-Unlimited-04.24.24 Airborne-FltTraining-04.25.24

Airborne-Unlimited-04.26.24

Tue, Dec 18, 2007

ISS Spacewalkers Investigate Station Power Woes

No Apparent Damage To Gimbal Assembly; Shavings Found In Joint

Expedition 16 astronauts Dan Tani and Peggy Whitson found no "smoking gun" for problems involving power generation onboard the International Space Station. The two astronauts wrapped up a 6-hour, 56-minute spacewalk focused on solar array issues at 1146 EST Tuesday morning.

NASA states the spacewalkers looked for the cause of partial loss of electrical power to one of the station's two Beta Gimbal Assemblies (BGAs) for starboard solar wings. They also examined damage to the starboard Solar Alpha Rotary Joint (SARJ) during the spacewalk, the 100th associated with assembly and maintenance onboard the ISS.

The SARJ enables the arrays to rotate to track the sun as the station orbits Earth. The BGA lets the solar wings tilt along their long axis to point more directly to the sun; the BGA's primary power was lost December 8, after three circuit breakers tripped. A backup power source still functions, but because of the loss of redundancy, the device was latched with the wing in a position suitable for docking of the shuttle Atlantis on STS-122.

Tani and Whitson found no apparent damage to BGA 1A during their 45-minute inspection. They disconnected two cables to facilitate ground tests; the circuit remained closed, apparently clearing the cables as suspects. Whitson reconnected them late in the spacewalk.

Next the spacewalkers moved to the SARJ. Working together, they removed two large drive lock assembly covers and inspected the race rings and bearings beneath them. Then they removed and inspected beneath most of the 22 covers.

That SARJ was locked after vibrations were noted and increased power consumption was seen. Inspection findings Tuesday showed various degrees of contamination under the individual covers. Generally it was similar to what had been seen previously.

Tani and Whitson described what they saw, took photos and used tape and a scraper to collect samples of debris in the SARJ. That debris included metal shavings and "dusting" in the SARJ race ring, which Tani compared to marching ants.

"It's hilarious," he reported, according to The Associated Press. "It's like it's animated, like they're alive."

The starboard array continues to produce some power, NASA reports, and no station operations have been affected. But managers want to resolve the SARJ and BGA problems before launch of the Japanese Kibo laboratory next year.

The spacewalk was the 100th for the construction and maintenance of the station. During the spacewalk, Whitson set a new record for cumulative spacewalk time by a woman.

FMI: www.nasa.gov/station

Advertisement

More News

ANN's Daily Aero-Term (04.26.24): DETRESFA (Distress Phrase)

DETRESFA (Distress Phrase) The code word used to designate an emergency phase wherein there is reasonable certainty that an aircraft and its occupants are threatened by grave and i>[...]

Aero-News: Quote of the Day (04.26.24)

"General aviation is at the forefront of developing and introducing innovative technologies that will transform the entire aviation industry..." Source: Kyle Martin, Vice President>[...]

ANN's Daily Aero-Term (04.27.24): Direct

Direct Straight line flight between two navigational aids, fixes, points, or any combination thereof. When used by pilots in describing off-airway routes, points defining direct ro>[...]

ANN's Daily Aero-Linx (04.27.24)

Aero Linx: Women in Corporate Aviation Women in Corporate Aviation support individuals seeking career advancement and professional development in the business aviation industry. Me>[...]

Aero-News: Quote of the Day (04.27.24)

“We would like to thank the many volunteers that help throughout the year to pull off the event, as well as the several reviewers, judges, and SURVICE staff that provide team>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC