KCLT Begins Repair Work On Runway 18L/36R | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Fri, May 01, 2015

KCLT Begins Repair Work On Runway 18L/36R

Runway Will Remain Operational Through The Rehabilitation Project, Closed Nightly

Repair work on Runway 18L/36R at Charlotte Douglas International Airport will take place Wednesday, April 29 – Tuesday, June 30. Crews will be rehabilitating the runway’s asphalt pavement to extend the useful life of the airstrip.

Runway 18L/36R will remain operational; however, it will be closed nightly, weather permitting, between 10 p.m. and 7 a.m. for nighttime paving by the contractor, Cedar Peaks Enterprises, Inc. The runway’s regular closure hours are 11 p.m. – 5 a.m.
 
As a result of the repair work, the Airport’s two other runways (18R/36L and 18C/36C) will solely be used for landings and departures between 5 a.m. – 7 a.m. and 10 p.m. – 11 p.m. through the end of June.
 
Runway 18R/36L is primarily used for arriving aircraft only. Residents southwest and northwest of the Airport, including those in York, Gaston and Lincoln counties, may experience additional aircraft activity due to this temporary change in operations.
 
Centerline lighting down the runway also will be replaced as part of the $5.4 million project. The majority of the repair work is being funded through a grant from the Federal Aviation Administration.
 
CLT uses Runway 18L/36R for both arrivals and departures. It is a 77 year old asphalt runway that opened in 1938. It is CLT’s easternmost runway. Typically, useful life for asphalt is 10 to 15 years. Runway 18L/36R was last repaved approximately 10 years ago.

(Image from KCLT via Facebook)

FMI: http://airport-charlotte.com/

 


Advertisement

More News

ANN's Daily Aero-Term (04.26.24): DETRESFA (Distress Phrase)

DETRESFA (Distress Phrase) The code word used to designate an emergency phase wherein there is reasonable certainty that an aircraft and its occupants are threatened by grave and i>[...]

ANN's Daily Aero-Linx (04.26.24)

Aero Linx: The International Association of Missionary Aviation (IAMA) The International Association of Missionary Aviation (IAMA) is comprised of Mission organizations, flight sch>[...]

Airborne 04.22.24: Rotor X Worsens, Airport Fees 4 FNB?, USMC Drone Pilot

Also: EP Systems' Battery, Boeing SAF, Repeat TBM 960 Order, Japan Coast Guard H225 Buy Despite nearly 100 complaints totaling millions of dollars of potential fraud, combined with>[...]

Airborne 04.24.24: INTEGRAL E, Elixir USA, M700 RVSM

Also: Viasat-uAvionix, UL94 Fuel Investigation, AF Materiel Command, NTSB Safety Alert Norges Luftsportforbund chose Aura Aero's little 2-seater in electric trim for their next gli>[...]

Airborne-NextGen 04.23.24: UAVOS UVH 170, magni650 Engine, World eVTOL Directory

Also: Moya Delivery Drone, USMC Drone Pilot, Inversion RAY Reentry Vehicle, RapidFlight UAVOS has recently achieved a significant milestone in public safety and emergency services >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC