Tecnam P2012 ‘Traveller' Roll-Out On Schedule | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Sat, Jun 06, 2015

Tecnam P2012 ‘Traveller' Roll-Out On Schedule

Event Planned For The Fourth Quarter Of This Year

Tecnam today announced that the production of the first TECNAM P2012 “Traveller” is progressing well on its Experimental Assembly Line (XAL) in Capua, Italy, with roll-out scheduled for Q4 2015.
The Tecnam P2012 Traveller is an eleven seat next generation piston engine twin, designed to comply with both FAR part 23 and EASA CS-23.

First verification tests of the preliminary P2012 design on the main aircraft elements such as the fuselage and tail planes have confirmed parameters declared in the initial production program.

Tecnam said in a news release that many airlines, from the US to Africa, Asia and Australia have been demanding a replacement for "heritage" airplanes in the FAR23/CS23 category currently in service around the world.

Tecnam’s Head of R&D, Prof. Luigi Pascale has designed the P2012 Traveller to enable operators to benefit from very low operating and maintenance costs in particular. Built to operative on even non-prepared runways, with easy and fast turnaround.

The P2012 Traveller has been designed to have high wing, fixed gear and two Lycoming TEO piston engines. Tecnam anticipates the P2012 delivering unbeatable Direct Operating Costs too.

The Tecnam P2012 Traveller will first see service as a passenger aeroplane but has been designed from the start to be a very versatile and flexible aerial platform, offering many multi role opportunities including Hydro, VIP, cargo shipping, parachuting and medevac services.

Initial flight-testing is expected by beginning of next year, as is the opening of the new P2012 Traveller production facility in Capua, Italy.

(Images provided by Tecnam)

FMI: http://p2012.tecnam.org

Advertisement

More News

ANN's Daily Aero-Term (05.02.24): Touchdown Zone Lighting

Touchdown Zone Lighting Two rows of transverse light bars located symmetrically about the runway centerline normally at 100 foot intervals. The basic system extends 3,000 feet alon>[...]

Aero-News: Quote of the Day (05.02.24)

“Discovery and innovation are central to our mission at Virgin Galactic. We’re excited to build on our successful record of facilitating scientific experiments in subor>[...]

Aero-News: Quote of the Day (05.03.24)

"We are reaching out to you today on behalf of the Popular Rotorcraft Association because we need your help. We are dangerously close to losing a critical resource that if lost, wi>[...]

ANN's Daily Aero-Term (05.03.24): UAS Traffic Management (UTM)

UAS Traffic Management (UTM) The unmanned aircraft traffic management ecosystem that will allow multiple low altitude BVLOS operations and which is separate from, but complementary>[...]

ANN's Daily Aero-Linx (05.03.24)

Aero Linx: Society of Aviation and Flight Educators (SAFE) SAFE is a member-oriented organization of aviation educators fostering professionalism and excellence in aviation through>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC