Boeing Starts Assembly Of Final KC-46A Test Aircraft | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Mon, Jan 20, 2014

Boeing Starts Assembly Of Final KC-46A Test Aircraft

On Track To Complete All  Four Test Aircraft By Midyear

The fourth and final KC-46A test aircraft for the U.S. Air Force’s next-generation aerial refueling tanker program is being assembled at Boeing's Everett factory, keeping the program on track to deliver the initial 18 tankers to the Air Force by 2017.

“All four test aircraft are moving through production to support our transition to ground and flight testing later this year,” said Maureen Dougherty, Boeing vice president and KC-46 Tanker program manager. “Our joint Boeing and U.S. Air Force team continues to deliver on our commitments to the warfighter.”

The aircraft are commercial derivatives of the Boeing 767 jetliner; their design features aerial refueling capabilities that will be installed later at Boeing Field in Seattle. The 767 is a proven jet in service as an airliner, freighter and international tanker, with more than 1,060 delivered worldwide.
 
The first flight of an Engineering and Manufacturing Development KC-46 tanker program test aircraft, without its aerial refueling systems, will take place at midyear, followed by the first flight of a KC-46A tanker in early 2015. The first delivery of a production aircraft to the Air Force is planned for early 2016. Boeing expects to build 179 tankers by 2027 if all options under the contract are exercised.

(USAF image)

FMI: www.af.mil, www.boeing.com

Advertisement

More News

ANN's Daily Aero-Term (04.26.24): DETRESFA (Distress Phrase)

DETRESFA (Distress Phrase) The code word used to designate an emergency phase wherein there is reasonable certainty that an aircraft and its occupants are threatened by grave and i>[...]

ANN's Daily Aero-Linx (04.26.24)

Aero Linx: The International Association of Missionary Aviation (IAMA) The International Association of Missionary Aviation (IAMA) is comprised of Mission organizations, flight sch>[...]

Airborne 04.22.24: Rotor X Worsens, Airport Fees 4 FNB?, USMC Drone Pilot

Also: EP Systems' Battery, Boeing SAF, Repeat TBM 960 Order, Japan Coast Guard H225 Buy Despite nearly 100 complaints totaling millions of dollars of potential fraud, combined with>[...]

Airborne 04.24.24: INTEGRAL E, Elixir USA, M700 RVSM

Also: Viasat-uAvionix, UL94 Fuel Investigation, AF Materiel Command, NTSB Safety Alert Norges Luftsportforbund chose Aura Aero's little 2-seater in electric trim for their next gli>[...]

Airborne-NextGen 04.23.24: UAVOS UVH 170, magni650 Engine, World eVTOL Directory

Also: Moya Delivery Drone, USMC Drone Pilot, Inversion RAY Reentry Vehicle, RapidFlight UAVOS has recently achieved a significant milestone in public safety and emergency services >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC