Scrubbed! Hydrogen Leak Postpones STS-127 Launch | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-09.16.24

Airborne-NextGen-09.17.24

Airborne-Unlimited-09.18.24

Airborne-FlightTraining-09.19.24

Airborne-Unlimited-09.20.24

Sat, Jun 13, 2009

Scrubbed! Hydrogen Leak Postpones STS-127 Launch

Gaseous Hydrogen Leak Creates Launch Hazard

A gaseous hydrogen leak on a vent line for space shuttle Endeavour is postponing Saturday morning's launch of Endeavour. The official scrub time was 0026 EDT. Launch teams began draining Endeavour's external fuel tank of its liquid hydrogen and liquid oxygen at 0006.

Fueling was halted after the leak was detected near the Ground Umbilical Carrier Plate, or GUCP, which attached to the external tank at its intertank area. The line leads from the GUCP back to the launch pad and to the "flare stack" where vented gaseous hydrogen is burned off.

The leak is similar to what happened during the first launch attempt of space shuttle Discovery's STS-119 mission in March.

After the leak is assessed, shuttle managers plan to meet Saturday morning to discuss what steps to take next, including targeting a new launch date for Endeavour's STS-127 mission to the International Space Station, though current estimates indicate that another launch attempt is at least 96 hours off.

Mission STS-127 is the 32nd flight dedicated to station construction, and the final of a series of three flights dedicated to the assembly of the Japanese Kibo laboratory complex.The STS-127 payload is the Kibo Japanese Experiment Module Exposed Facility and Experiment Logistics Module Exposed Section.

FMI: www.nasa.gov

Advertisement

More News

ANN's Daily Aero-Term (09.17.24): Instrument Approach Procedure (IAP) Charts

Instrument Approach Procedure (IAP) Charts Portray the aeronautical data which is required to execute an instrument approach to an airport. These charts depict the procedures, incl>[...]

Aero-News: Quote of the Day (09.17.24)

“Our industry is approaching a 30-year innovation cycle, and we have less than 25 years to decarbonize aviation. We need to develop new methods to get net zero aerospace tech>[...]

Airborne 09.16.24: Bristell Shooting, EAA v FAA, Boeing Strike!

Also: Girls in Aviation Day, B-29 Doc Heads 4 Chino, C-17 Tail Cone Detaches, Bulgaria Airshow Accident One of two private aircraft that launched from Apatity Airport near Murmansk>[...]

Classic Aero-TV: CubCrafters NX Cub-A Stunning Effort To Build The ‘Perfect Cub'

From 2021 (YouTube Version): We Were Blown Away At How Well The Nosewheel Was Adapted To The X Cub Airframe It should not be a secret to any one of you, that with thousands of hour>[...]

Airborne 09.18.24: Boom XB-1 3rd Test, DJI Ban, SubSonex To EAA Museum

Also: Volato Nixed by Honda, New B-21 Bases, A-10 Unit Inactivated, Gogo/Airshare Boom Supersonic announced its demonstrator aircraft XB-1 successfully completed its third test fli>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC