Sikorsky S-97 Raider Program Begins Ground Tests | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-10.28.24

Airborne-NextGen-10.29.24

Airborne-Unlimited-10.30.24

Airborne-Unlimited-10.24.24

Airborne-Unlimited-10.25.24

Fri, Feb 06, 2015

Sikorsky S-97 Raider Program Begins Ground Tests

Aircraft Remains Tied To The Ground While Systems Are Evaluated

Bladed ground testing, a major milestone, for the S-97 Raider program, is underway, according to Sikorsky. The Raider is an armed reconnaissance rotorcraft designed to significantly outmatch conventional military helicopters in maneuverability, payload, speed, range and high/hot environmental conditions.

"Testing all of the aircraft's systems together, for the first time, marks significant progress in the development of this next generation helicopter and moves the program closer to first flight," said S-97 Raider Program Manager Mark Hammond.

During the ground runs phase, the S-97 Raider team is testing the first of two aircraft prototypes as a completed system for the first time. The team will perform initial ground tests with the aircraft tied down and will focus on verifying correct operation of the propulsion system, drive train, rotor control system and pilot-vehicle interface. 

This testing comes on the heels of the recent successful completion of software qualification testing, component fatigue testing, and gearbox testing, for the first S-97 Raider prototype.

Sikorsky launched the S-97 Raider program in October 2010 with the objectives of maturing the X2 rotorcraft design and offering a helicopter to meet U.S. Army reconnaissance and special operations needs.

In addition to ground runs for the first prototype, the program team at Sikorsky's Development Flight Center in West Palm Beach, Florida, is prepared to begin final assembly of the second prototype S-97 Raider helicopter, following acceptance last month of the fuselage structure from Aurora Flight Sciences. Sikorsky rolled out the first prototype in October 2014.  

Based on Sikorsky's rigid X2 rotor coaxial design, the S-97 Raider helicopter features next-generation technologies in a multi-mission configuration, capable of carrying six troops and external weapons. The coaxial counter-rotating main rotors and pusher propeller provide cruise speeds up to 220 knots.

"We look forward to the opportunity to demonstrate the Raider's revolutionary performance and unmatched maneuverability for the U.S. Army," said Steve Engebretson, Director, Advanced Military Programs. "We're delivering on our promise to design and build a helicopter with performance capabilities not seen before."

The S-97 Raider helicopter demonstrator program is 100 percent industry-funded. Sikorsky provides 75 percent of the investment and the suppliers provide the remaining funding. Sikorsky's goal is to attract government interest in the program.

(Image provided by Sikorsky)

FMI: www.sikorsky.com

Advertisement

More News

Senator Pushes FAA to Accelerate Rocket Launch Licensing

States That Current Process is Damaging National Aerospace Development US Senator Jerry Morgan is pushing the FAA to speed up the process for rocket launch licensing. He argues tha>[...]

Classic Aero-TV: RJ Gritter - Part of Aviation’s Bright New Future

From 2015 (YouTube Edition): Model Aviator Aims For Full-Scale Career While at the 2015 Indoor Electric RC Festival, referred to as eFest, ANN CEO and Editor-In-Chief, Jim Campbell>[...]

Aero-FAQ: Dave Juwel's Aviation Marketing Stories -- ITBOA BNITBOB

Dave Juwel's Aviation Marketing Stories ITBOA BNITBOB ... what does that mean? It's not gibberish, it's a lengthy acronym for "In The Business Of Aviation ... But Not In The Busine>[...]

ANN's Daily Aero-Linx (10.27.24)

Aero Linx: Cardinal Flyers Online The Cardinal Flyers Online Web site was created and is maintained by me, Keith Peterson. My wife Debbie and I have owned a 1976 RG since 1985. Wit>[...]

ANN's Daily Aero-Term (10.27.24): Clearance Void If Not Off By (Time)

Clearance Void If Not Off By (Time) Used by ATC to advise an aircraft that the departure release is automatically canceled if takeoff is not made prior to a specified time. The exp>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC