Spaceship Orion Takes Its First Voyage | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Wed, Nov 27, 2019

Spaceship Orion Takes Its First Voyage

Loaded Onto A Super Guppy Aircraft To Travel From Florida To Ohio

The Orion spaceship took off on board a Super Guppy aircraft from the Kennedy Space Center on Sunday, November 24: destination the world’s largest thermal vacuum chamber, owned by NASA. This is where the hot test phase of several months will begin for the spacecraft. The Super Guppy landed at Mansfield, Ohio. The transfer to Plum Brook Station in Sandusky, Ohio, took place Tuesday, November 26th.

A team of engineers and technicians from Airbus, the European Space Agency (ESA), Lockheed Martin and NASA are ready to put the spacecraft through simulations of extreme space conditions. "With the tests, we will show that the spacecraft's systems work as planned and at the same time ensure safe operation for the astronauts on future missions - both on the ground and on board," says Matthias Gronowski, Chief Engineer for the European Service Module that Airbus is building for NASA on behalf of  ESA.  

The tests will be conducted in two phases in the world's largest vacuum chamber at NASA's Glenn Test Center in Plum Brook, Ohio. First there will be a 63-day thermal test. Orion's electrical systems will be switched on and operated under vacuum and in temperatures which simulate the environmental conditions in space. During this phase, the spacecraft will be exposed to extreme temperatures from about minus 115 to plus 75 degrees Celsius to reproduce the conditions the spacecraft will be exposed to, when in direct sunlight and in shadow in space.

The second phase is an electromagnetic compatibility test, which lasts about 14 days. Each electronic component emits a kind of electromagnetic field that can affect the performance of other nearby electronics. These tests ensure that the spacecraft's electronics function properly while operating. "This is a very important milestone for the journey to the Moon," says Gronowski. "The international team has been working towards this goal for three years now, and in recent months we have mechanically and electrically connected the Crew Module (astronaut capsule) and the European Service Module at Kennedy Space Center. What matters now is that we can show that the service module works under the extreme conditions of space," Gronowski continues.

After successful testing, Orion will return to NASA's Kennedy Space Center, where further tests and preparations for integration with the new Space Launch System (SLS) rocket will start before the launch of Artemis I at the end of 2020.

ESA's European Service Module will provide propulsion, power, air and water for the astronauts, as well as thermal control of the entire spacecraft. The first launch - without astronauts - is planned for the end of 2020. Artemis I will travel once around the Moon and back to Earth. Airbus in Bremen is already building the second Orion Service Module, with which astronauts will fly to the Moon and back to Earth for the first time (2022 / 2023).

(Images provided with Airbus news release)

FMI: www.airbus.com

Advertisement

More News

ANN's Daily Aero-Term (04.25.24): Airport Rotating Beacon

Airport Rotating Beacon A visual NAVAID operated at many airports. At civil airports, alternating white and green flashes indicate the location of the airport. At military airports>[...]

ANN's Daily Aero-Linx (04.25.24)

Aero Linx: Fly for the Culture Fly For the Culture, Inc. is a 501(c)(3) non-profit organization that serves young people interested in pursuing professions in the aviation industry>[...]

Klyde Morris (04.22.24)

Klyde Is Having Some Issues Comprehending The Fed's Priorities FMI: www.klydemorris.com>[...]

Airborne 04.24.24: INTEGRAL E, Elixir USA, M700 RVSM

Also: Viasat-uAvionix, UL94 Fuel Investigation, AF Materiel Command, NTSB Safety Alert Norges Luftsportforbund chose Aura Aero's little 2-seater in electric trim for their next gli>[...]

Airborne 04.22.24: Rotor X Worsens, Airport Fees 4 FNB?, USMC Drone Pilot

Also: EP Systems' Battery, Boeing SAF, Repeat TBM 960 Order, Japan Coast Guard H225 Buy Despite nearly 100 complaints totaling millions of dollars of potential fraud, combined with>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC