Boeing 777X Wind Tunnel Testing Under Way | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Tue, Dec 10, 2013

Boeing 777X Wind Tunnel Testing Under Way

Low-Speed Model 'Flying' At QinetiQ Test Facility In The U.K.

Low-speed wind tunnel tests are underway for the Boeing 777X, a major milestone in airplane development. Testing started on Dec. 5 at QinetiQ's test facility in Farnborough, U.K. Wind tunnel models allow experts to test many different configurations for the airplane. Low-speed tests measure airplane performance with a variety of high-lift surface settings to simulate takeoff and landing conditions.

"This is the first major development milestone for the program since we launched the program last month," said Terry Beezhold, vice president and chief project engineer of the 777X program. "Wind tunnel testing will validate our performance models and generate a vast amount of data that our engineering teams will use to design the airplane in this phase of development."

The low-speed model currently being tested is a 0.05 percent scale model of the baseline 777X, measuring about 166 inches long with a wing span of 154 inches. Hundreds of sensors are embedded in the model to measure pressure to determine the in-flight loads as well as provide valuable diagnostics of the aerodynamic performance of a given design.

Low-speed testing at the QinetiQ facility is expected to last approximately five months. Testing also will be conducted next year at the Boeing Transonic Wind Tunnel in Seattle to further validate 777X high-speed performance projections.

"We are on track to complete our top-level design in 2014 and reach firm configuration in 2015," said Beezhold.

The 777X family includes the 777-8X and the 777-9X, both designed to respond to market needs and customer preferences. The airplane introduces the latest technologies in multiple places, including the most advanced commercial engine ever – the GE9X by GE Aviation – and an all-new high-efficiency composite wing that has a longer span than today's 777.

Boeing and QinetiQ recently concluded an agreement that will extend the wind tunnel partnership at Farnborough for an additional five years.

The 777X program was launched last month with 259 orders and commitments from Emirates, Etihad, Lufthansa and Qatar Airways.

(Image provided by Boeing)

FMI: www.boeing.com

Advertisement

More News

ANN's Daily Aero-Term (04.24.24): Runway Lead-in Light System

Runway Lead-in Light System Runway Lead-in Light System Consists of one or more series of flashing lights installed at or near ground level that provides positive visual guidance a>[...]

ANN's Daily Aero-Linx (04.24.24)

Aero Linx: Aviation Without Borders Aviation Without Borders uses its aviation expertise, contacts and partnerships to enable support for children and their families – at hom>[...]

Aero-FAQ: Dave Juwel's Aviation Marketing Stories -- ITBOA BNITBOB

Dave Juwel's Aviation Marketing Stories ITBOA BNITBOB ... what does that mean? It's not gibberish, it's a lengthy acronym for "In The Business Of Aviation ... But Not In The Busine>[...]

Classic Aero-TV: Best Seat in The House -- 'Inside' The AeroShell Aerobatic Team

From 2010 (YouTube Version): Yeah.... This IS A Really Cool Job When ANN's Nathan Cremisino took over the lead of our Aero-TV teams, he knew he was in for some extra work and a lot>[...]

Airborne Affordable Flyers 04.18.24: CarbonCub UL, Fisher, Affordable Flyer Expo

Also: Junkers A50 Heritage, Montaer Grows, Dynon-Advance Flight Systems, Vans' Latest Officially, the Carbon Cub UL and Rotax 916 iS is now in its 'market survey development phase'>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC