Here We Go Again! | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Tue, Jun 14, 2005

Here We Go Again!

New Date And Time For Space Shuttle Discovery's Rollout

Space Shuttle Discovery is set to roll out to Launch Pad 39B at NASA's Kennedy Space Center (KSC), FL, with an upgraded External Tank. First motion is currently targeted for 0001 EDT Wednesday, June 15.

The fully-assembled Space Shuttle vehicle, or stack -- consisting of the orbiter, External Tank (ET) and twin Solid Rocket Boosters --will be mounted on the Mobile Launcher Platform and delivered to the pad via a Crawler Transporter. The four-mile journey from the Vehicle Assembly Building (VAB) to the pad will take about six hours.

Discovery's initial move to Launch Pad 39B will be covered live on NASA Television. Live commentary will begin at the first motion of the Crawler Transporter and continue for about one hour. Live commentary will provide periodic updates and conclude once Discovery reaches the pad. In addition, NASA TV will broadcast live rollout images from 0500 to 0800.

FMI: www.nasa.gov/returntoflight

Advertisement

More News

ANN's Daily Aero-Term (05.02.24): Touchdown Zone Lighting

Touchdown Zone Lighting Two rows of transverse light bars located symmetrically about the runway centerline normally at 100 foot intervals. The basic system extends 3,000 feet alon>[...]

Aero-News: Quote of the Day (05.02.24)

“Discovery and innovation are central to our mission at Virgin Galactic. We’re excited to build on our successful record of facilitating scientific experiments in subor>[...]

Aero-News: Quote of the Day (05.03.24)

"We are reaching out to you today on behalf of the Popular Rotorcraft Association because we need your help. We are dangerously close to losing a critical resource that if lost, wi>[...]

ANN's Daily Aero-Term (05.03.24): UAS Traffic Management (UTM)

UAS Traffic Management (UTM) The unmanned aircraft traffic management ecosystem that will allow multiple low altitude BVLOS operations and which is separate from, but complementary>[...]

ANN's Daily Aero-Linx (05.03.24)

Aero Linx: Society of Aviation and Flight Educators (SAFE) SAFE is a member-oriented organization of aviation educators fostering professionalism and excellence in aviation through>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC