Boeing Breaks Ground In St. Louis For New Composites Center | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-Unlimited-04.23.24

Airborne-Unlimited-04.24.24 Airborne-FltTraining-04.25.24

Airborne-Unlimited-04.26.24

Thu, Dec 18, 2014

Boeing Breaks Ground In St. Louis For New Composites Center

Facility To Support 777X Work And Future Opportunities

Construction is underway in St. Louis for a new 367,000-square-foot facility in which Boeing will build parts for the newest member of its 777 commercial airplanes family, the 777X.

About 700 new jobs will be created for the 777X work. Construction should be complete in 2016, with work on 777X wing and empennage parts starting in 2017. The facility is an expansion of Boeing’s current tooling center at the site and will contain six autoclaves.

“As we move forward with construction of our new center, we will significantly enhance our aerospace composite capability in St. Louis, positioning us for today’s opportunities, and tomorrow’s,” said Bob Ciesla, vice president, Boeing Military Aircraft Cross-Enterprise Design/Build. “This is a tremendous opportunity for Boeing St. Louis and the entire region, which enables us to bridge to the future as a site with both commercial and defense capabilities.”

Boeing’s St. Louis site, which marked its 75th anniversary this year, is renowned for military aircraft production. More than 12,000 fighter jets have been built there and the site is headquarters for the Boeing Defense, Space & Security business unit. As of Dec.1, the company had about 15,000 employees in Missouri.

Earlier this year, Boeing selected its Everett, Wash. site as the location for a new composite wing center for the 777X program. In this wing center, Boeing will perform fabrication and assembly of the 777X’s composite wing. Additionally, Boeing will perform final assembly of the 777X in Everett.

There will be two 777X models – the 777-8X, with approximately 350 seats and a range capability of more than 9,300 nautical miles; and the 777-9X, with approximately 400 seats and a range of more than 8,200 nautical miles. The 777X has 300 orders and commitments from six customers worldwide. First delivery is targeted for 2020.

(Image from file)

FMI: www.boeing.com

Advertisement

More News

ANN's Daily Aero-Term (04.26.24): DETRESFA (Distress Phrase)

DETRESFA (Distress Phrase) The code word used to designate an emergency phase wherein there is reasonable certainty that an aircraft and its occupants are threatened by grave and i>[...]

Aero-News: Quote of the Day (04.26.24)

"General aviation is at the forefront of developing and introducing innovative technologies that will transform the entire aviation industry..." Source: Kyle Martin, Vice President>[...]

ANN's Daily Aero-Term (04.27.24): Direct

Direct Straight line flight between two navigational aids, fixes, points, or any combination thereof. When used by pilots in describing off-airway routes, points defining direct ro>[...]

ANN's Daily Aero-Linx (04.27.24)

Aero Linx: Women in Corporate Aviation Women in Corporate Aviation support individuals seeking career advancement and professional development in the business aviation industry. Me>[...]

Aero-News: Quote of the Day (04.27.24)

“We would like to thank the many volunteers that help throughout the year to pull off the event, as well as the several reviewers, judges, and SURVICE staff that provide team>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC