New USAF Bomber Slated For 2022 Roll-Out | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-Unlimited-04.23.24

Airborne-Unlimited-04.24.24 Airborne-FltTraining-04.25.24

Airborne-Unlimited-04.26.24

Sat, May 28, 2022

New USAF Bomber Slated For 2022 Roll-Out

Northrop-Grumman Reports B-21 Proceeding Apace in Ground-Testing

Northrop Grumman stated that the public unveiling of its next-generation stealth bomber, the B-21 Raider, is still expected later this year.

The aircraft—an advanced, very long-range, heavy-payload, stealthy, intercontinental strategic bomber—is an integral component of the U.S. Air Force’s Long Range Strike Bomber (LRS-B) program. When complete, the B-21 will be able to deliver conventional and/or thermonuclear ordnance to targets anywhere in the world.

Expected to enter service in 2026, the B-21 Raider is to complement existing Rockwell B-1 Lancer, Northrop Grumman B-2 Spirit, and Boeing B-52 fleets already in U.S. service, and eventually replace these bombers.

Currently, six B-21s are in production, with the first aircraft having completed a series of ground-tests at Air Force Plant 42 in Palmdale, California. Subject tests included critical load-calibration assessments which encompassed configuring the aircraft’s instruments and verifying its structural integrity. Subsequent ground-testing comprised powering up the bomber, assessing its subsystems, and applying protective coatings and paint.

Northrop plans to carry out engine runs, and both low and high-speed taxi tests before the B-21 departs on its maiden flight from Palmdale to Edwards Air Force Base, where formal flight testing will commence.

Northrop’s confirmation of a 2023 first flight imparts a degree of certainty to a program thus-far hampered by delays. Original hopes for a December 2021 first flight of the new bomber went unrealized, and both Air Force and Northrop officials have subsequently become more cautious in their statements.

FMI: www.af.mil, www.northropgrumman.com

Advertisement

More News

ANN's Daily Aero-Term (04.26.24): DETRESFA (Distress Phrase)

DETRESFA (Distress Phrase) The code word used to designate an emergency phase wherein there is reasonable certainty that an aircraft and its occupants are threatened by grave and i>[...]

Aero-News: Quote of the Day (04.26.24)

"General aviation is at the forefront of developing and introducing innovative technologies that will transform the entire aviation industry..." Source: Kyle Martin, Vice President>[...]

ANN's Daily Aero-Term (04.27.24): Direct

Direct Straight line flight between two navigational aids, fixes, points, or any combination thereof. When used by pilots in describing off-airway routes, points defining direct ro>[...]

ANN's Daily Aero-Linx (04.27.24)

Aero Linx: Women in Corporate Aviation Women in Corporate Aviation support individuals seeking career advancement and professional development in the business aviation industry. Me>[...]

Aero-News: Quote of the Day (04.27.24)

“We would like to thank the many volunteers that help throughout the year to pull off the event, as well as the several reviewers, judges, and SURVICE staff that provide team>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC