Navy Takes Delivery Of Final Block II Super Hornet | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-Unlimited-04.23.24

Airborne-Unlimited-04.24.24 Airborne-FltTraining-04.25.24

Airborne-Unlimited-04.26.24

Tue, Apr 28, 2020

Navy Takes Delivery Of Final Block II Super Hornet

Looking Ahead To Block III

Since 2005, F/A-18 Super Hornet Block II aircraft have been rolling off Boeing’s production line and serving as the U.S. Navy’s multi-mission capable workhorse. The service took delivery of the final Block II Super Hornet, closing out a run of 322 one-seater F/A-18Es and 286 two-seated F/A-18Fs, on April 17.

“Aircraft E322 will leave Boeing’s production line and head straight to Strike Fighter Squadron (VFA) 34 based in [Naval Air Station] Oceana,” explained Cmdr. Tyler Tennille, of Defense Contract Management Agency (DCMA), who oversees Acceptance Testing.

“When the Super Hornets first came online, they were a game changer,” he explained, pointing to the Block II’s Active Electronically Scanned Array (AESA) radar as well as larger displays, upgraded sensors and avionics, and increased range and capability to employ an arsenal of precision weapons that delivered advanced lethality and mission flexibility for the service.

The robust airframe was built with an open mission systems architecture, which has enabled easy integration of new weapons and technologies. The Block II Super Hornet serves as the Navy’s responsive aircraft, fully capable across the full mission spectrum which includes: air superiority, fighter escort, reconnaissance, aerial refueling, close air support, air defense suppression, and day/night precision strike.

This aircraft has stood strong as the backbone of the Navy’s carrier air wing, and has proven itself repeatedly during numerous operations where it has been the preeminent platform performing multiple missions, sometimes rapidly reconfiguring on the fly.

Even though it is substantially larger – roughly 7,000 pounds heavier and a 50 percent higher range, the Super Hornet delivered with fewer parts and lower maintenance demands than its predecessor, the Hornet.

“Delivery of this last production Block II Super Hornet is hardly the end of an era, but rather a stepping stone along the path to continuously evolving our platforms to meet the Navy’s ever-evolving needs,” said Capt. Jason Denney, Program Manager of the F/A-18 and EA-18 Program Office (PMA-265). “Block III delivery is just steps behind and the production lines won’t miss a beat, with the first two U.S. Navy Block III test jets delivering in the next two months, followed by delivery of 24 E/F aircraft over the next year for our international customer, Kuwait,” Denney said.

Following the delivery of these aircraft, Tennille said he expects the transition from Block IIs to Block IIIs to be seamless.

The proven capabilities and successes of the Block II program were leveraged by the Navy in awarding a multi-year procurement contract for Block III Super Hornets to Boeing in March 2019, totaling approximately $4 billion. The Navy will procure 72 Block III Super Hornet aircraft between fiscal years 2019 and 2021, while realizing more efficient production rates and providing the supporting industrial base with stability and advantages in production and spares planning.

Boeing is expected to deliver the Block III test jets to the Navy as early as late spring, where subsequent testing will commence at both NAS Patuxent River and Naval Air Weapons System (NAWS) China Lake. This latest version of the Super Hornet includes an advanced cockpit system; advanced network infrastructure; reduced radar cross-section; and a 10,000-flight hour lifespan.

“Though we’ve done tremendous work to meet readiness requirements, we know continual forward momentum is needed to sustain that readiness while maintaining our tactical advantage to be more lethal and survivable than our potential adversaries,” said Denney. “The solid partnership with Boeing for the Block III production and modification programs ensures the Super Hornet will remain not only relevant, but ready to fight in today’s dynamic global environment and well into the future.”

FMI: www.navy.mil/local/navair/

Advertisement

More News

ANN's Daily Aero-Term (04.26.24): DETRESFA (Distress Phrase)

DETRESFA (Distress Phrase) The code word used to designate an emergency phase wherein there is reasonable certainty that an aircraft and its occupants are threatened by grave and i>[...]

Aero-News: Quote of the Day (04.26.24)

"General aviation is at the forefront of developing and introducing innovative technologies that will transform the entire aviation industry..." Source: Kyle Martin, Vice President>[...]

ANN's Daily Aero-Term (04.27.24): Direct

Direct Straight line flight between two navigational aids, fixes, points, or any combination thereof. When used by pilots in describing off-airway routes, points defining direct ro>[...]

ANN's Daily Aero-Linx (04.27.24)

Aero Linx: Women in Corporate Aviation Women in Corporate Aviation support individuals seeking career advancement and professional development in the business aviation industry. Me>[...]

Aero-News: Quote of the Day (04.27.24)

“We would like to thank the many volunteers that help throughout the year to pull off the event, as well as the several reviewers, judges, and SURVICE staff that provide team>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC