Electronic Flight Strip System Goes Into Operation At UK's Jersey Airport | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-Unlimited-04.23.24

Airborne-Unlimited-04.24.24 Airborne-FltTraining-04.25.24

Airborne-Unlimited-04.26.24

Mon, Mar 28, 2011

Electronic Flight Strip System Goes Into Operation At UK's Jersey Airport

Northrop Grumman Traffic Management System Replaces Paper Strips

An Electronic Flight Strip (EFS) system is now operational at Jersey Airport, Channel Islands, UK. In December 2010, Jersey Airport's new control tower and approach center became fully operational. Northrop Grumman Park Air Systems provided the EFS system under a subcontract to the UK's National Air Traffic Services (NATS). The EFS system automates the production, distribution and administrative management of flight plan information and other air traffic control data and replaces the paper strip systems previously used by air traffic controllers.

"Our integrated air traffic management system will help controllers meet the demands for increased airspace capacity at Jersey airport," said Eldar Hauge, managing director for Northrop Grumman Park Air Systems Norway. "We are proud of our strong partnership with NATS and delighted that our products were selected for the tower fit-out at Jersey Airport and that they are now in operation."

The EFS also provides data integrity checking, eases the working environment of air traffic controllers and paves the way for the application of advanced features such as Controller Pilot Data Link Communications. The system installed at Jersey exchanges data via standard links with both the enroute centers at Swanwick in the UK and Brest in France, as well as a data link to Guernsey.

"The project faced considerable challenges in delivering EFS for tower, approach and zone facilities in conjunction with moving the Jersey air traffic control center to a new facility," said Derek Brien, NATS Manager Special Projects for Jersey Airport. "The success of the project is testament to the dedication of the entire project team, specifically both customer and supplier in identifying requirements and solutions throughout the project cycle."

FMI: www.northropgrumman.com

Advertisement

More News

Unfortunate... ANN/SportPlane Resource Guide Adds To Cautionary Advisories

The Industry Continues to be Rocked By Some Questionable Operations Recent investigations and a great deal of data has resulted in ANN’s SportPlane Resource Guide’s rep>[...]

ANN FAQ: Turn On Post Notifications

Make Sure You NEVER Miss A New Story From Aero-News Network Do you ever feel like you never see posts from a certain person or page on Facebook or Instagram? Here’s how you c>[...]

ANN's Daily Aero-Term (04.29.24): Visual Approach Slope Indicator (VASI)

Visual Approach Slope Indicator (VASI) An airport lighting facility providing vertical visual approach slope guidance to aircraft during approach to landing by radiating a directio>[...]

ANN's Daily Aero-Term (04.28.24): Airport Marking Aids

Airport Marking Aids Markings used on runway and taxiway surfaces to identify a specific runway, a runway threshold, a centerline, a hold line, etc. A runway should be marked in ac>[...]

ANN's Daily Aero-Linx (04.28.24)

Aero Linx: The Skyhawk Association The Skyhawk Association is a non-profit organization founded by former Skyhawk Pilots which is open to anyone with an affinity for the A-4 Skyhaw>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC