General Dynamics Delivers First F-15 Wideband Radome To Boeing | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-Unlimited-04.23.24

Airborne-Unlimited-04.24.24 Airborne-FltTraining-04.25.24

Airborne-Unlimited-04.26.24

Mon, Apr 05, 2010

General Dynamics Delivers First F-15 Wideband Radome To Boeing

Delivery Marks The Start Of A Radar Modernization Program

General Dynamics Armament and Technical Products has delivered its first F-15 wideband nose radome to Boeing in support of the F-15 Radar Modernization Program (RMP) under a system development and demonstration (SDD) contract that was awarded in October 2008.

The RMP radome will fly on the U.S. Air Force F-15E as part of the RMP upgrade. Benefits of the radome include superior electrical performance over a wide frequency range, low weight, low part count, and the ability to perform in high heat and stress environment. The radome also includes the installation and integration of an instrument landing system antenna.

"We are pleased to achieve this program milestone on schedule and within budget to support Boeing's work on the F-15 RMP," said Jim Losse, vice president and general manager of advanced materials for General Dynamics Armament and Technical Products. "Our team in Marion has built wideband radomes for years, and we are excited to add the F-15 RMP nose radome to our facility and workforce's capabilities."

The SDD contract scope includes radome design, material strength and environmental testing, environmental and structural qualification, tool design, fabrication, assembly and repair-methods development. Production and program management is being performed at General Dynamics' advanced materials facility in Marion, VA. Ten radomes will be built as part of the SDD phase, with deliveries completed in April 2011.

FMI: www.generaldynamics.com, www.boeing.com

Advertisement

More News

ANN's Daily Aero-Term (04.28.24): Airport Marking Aids

Airport Marking Aids Markings used on runway and taxiway surfaces to identify a specific runway, a runway threshold, a centerline, a hold line, etc. A runway should be marked in ac>[...]

Aero-News: Quote of the Day (04.28.24)

"It is extremely difficult, if not impossible, for manned aircraft to see a drone while conducting crop-enhancing and other aerial applications at low altitudes and high speeds. We>[...]

ANN's Daily Aero-Linx (04.28.24)

Aero Linx: The Skyhawk Association The Skyhawk Association is a non-profit organization founded by former Skyhawk Pilots which is open to anyone with an affinity for the A-4 Skyhaw>[...]

Aero-News: Quote of the Day (04.29.24)

“The T-54A benefits from an active Beechcraft King Air assembly line in Wichita, Kansas, where all required METS avionics and interior modifications are installed on the line>[...]

ANN's Daily Aero-Linx (04.29.24)

Aero Linx: Aerostar Owners Association The Association offers the Aerostar Owner a unique opportunity to tap an invaluable source of information concerning the care and feeding of >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC