Australian Army's Tactical UAS Replacement Project Finalizes Shortlist | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Mon, Mar 30, 2020

Australian Army's Tactical UAS Replacement Project Finalizes Shortlist

Looking To Replace Shadow 200 Tactical Unmanned Aerial System Aircraft

The replacement of the Australian Army’s Shadow 200 Tactical Unmanned Aerial System (UAS) through project LAND 129 Phase 3 has progressed to the tendering process.

Four companies have been selected through an abbreviated Invitation To Register process and will be provided a detailed Request for Tender, to further explore plans and conceptual integration designs.

The four down-selected companies are:

  • Insitu Pacific Pty Ltd
  • Leidos Australia
  • Raytheon Australia Pty Ltd
  • Textron Systems Australia Pty Ltd

Australian small businesses in our defence industry and participants in the Invitation To Register are thanked for their continued support of project LAND 129 Phase 3.

Deputy Director Army UAS Projects – Mr Andrew McKinnon said there are a number of local companies already involved in the Australian Defence Force’s Unmanned Systems space. “These companies are encouraged to continue their engagement with the LAND 129 Phase 3 down-selected tenderers in order to deliver a world class capability,” McKinnon said.

“Unmanned Aerial Systems are a key component of Army’s Surveillance and Reconnaissance capability, with some smaller Unmanned Systems recently being used on Operation Bushfire Assist."

The next phase of the project will focus on a competitive evaluation of more comprehensive tendered solutions from the four Primes, prior to progressing the project to Government consideration in 2021.

(Image provided with MoD Australia news release)

FMI: www.defence.gov.au

Advertisement

More News

ANN's Daily Aero-Term (04.26.24): DETRESFA (Distress Phrase)

DETRESFA (Distress Phrase) The code word used to designate an emergency phase wherein there is reasonable certainty that an aircraft and its occupants are threatened by grave and i>[...]

ANN's Daily Aero-Linx (04.26.24)

Aero Linx: The International Association of Missionary Aviation (IAMA) The International Association of Missionary Aviation (IAMA) is comprised of Mission organizations, flight sch>[...]

Airborne 04.22.24: Rotor X Worsens, Airport Fees 4 FNB?, USMC Drone Pilot

Also: EP Systems' Battery, Boeing SAF, Repeat TBM 960 Order, Japan Coast Guard H225 Buy Despite nearly 100 complaints totaling millions of dollars of potential fraud, combined with>[...]

Airborne 04.24.24: INTEGRAL E, Elixir USA, M700 RVSM

Also: Viasat-uAvionix, UL94 Fuel Investigation, AF Materiel Command, NTSB Safety Alert Norges Luftsportforbund chose Aura Aero's little 2-seater in electric trim for their next gli>[...]

Airborne-NextGen 04.23.24: UAVOS UVH 170, magni650 Engine, World eVTOL Directory

Also: Moya Delivery Drone, USMC Drone Pilot, Inversion RAY Reentry Vehicle, RapidFlight UAVOS has recently achieved a significant milestone in public safety and emergency services >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC