Raytheon F-35 JPALS Can Be Set Up Anywhere In Less Than 90 Minutes | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-09.15.25

AirborneNextGen-
09.09.25

Airborne-Unlimited-09.10.25

Airborne-AffordableFlyers-09.11.25

AirborneUnlimited-09.12.25

Sat, Sep 21, 2019

Raytheon F-35 JPALS Can Be Set Up Anywhere In Less Than 90 Minutes

System Was Fully Operational In 70 Minutes In Field Tests

A Raytheon Company team recently conducted a rapid set up demonstration of a land-based expeditionary version of its Joint Precision Approach and Landing System to a group of global military officials at Naval Air Station Patuxent River, MD. JPALS is a GPS-based precision landing system that guides aircraft to precision landings in all weather and surface conditions.

"The entire system was fully operational in 70 minutes on Day One and 50 minutes on Day Two," said Matt Gilligan, vice president at Raytheon's Intelligence, Information and Services business. "Raytheon is offering the U.S. and its allies fast and accurate precision landing systems that support operations from bare-base locations."

During the demonstration, military officials from all four services, as well as representatives from Japan, United Kingdom, The Netherlands, and Italy, watched multiple F-35Cs land on the same designated runway landing point every time over the course of six different approaches.

This was the second proof-of-concept event in 2019 showing how F-35s can use a reconfigured mobile version of JPALS to support landings in austere environments.  

(Source: Raytheon news release. Image from file)

FMI: www.raytheon.com

Advertisement

More News

NTSB Final Report: Evektor-Aerotechnik A S Harmony LSA

Improper Installation Of The Fuel Line That Connected The Fuel Pump To The Four-Way Distributor Analysis: The airplane was on the final leg of a flight to reposition it to its home>[...]

ANN's Daily Aero-Term (09.15.25): Decision Altitude (DA)

Decision Altitude (DA) A specified altitude (mean sea level (MSL)) on an instrument approach procedure (ILS, GLS, vertically guided RNAV) at which the pilot must decide whether to >[...]

Aero-News: Quote of the Day (09.15.25)

“With the arrival of the second B-21 Raider, our flight test campaign gains substantial momentum. We can now expedite critical evaluations of mission systems and weapons capa>[...]

Airborne 09.12.25: Bristell Cert, Jetson ONE Delivery, GAMA Sales Report

Also: Potential Mars Biosignature, Boeing August Deliveries, JetBlue Retires Final E190, Av Safety Awareness Czech plane maker Bristell was awarded its first FAA Type Certification>[...]

Airborne 09.10.25: 1000 Hr B29 Pilot, Airplane Pile-Up, Haitian Restrictions

Also: Commercial A/C Certification, GMR Adds More Bell 429s, Helo Denial, John “Lucky” Luckadoo Flies West CAF’s Col. Mark Novak has accumulated more than 1,000 f>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC