Generation Orbit Prepares For GO1 Wind Tunnel And Hot Fire Testing | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-11.17.25

AirborneNextGen-
11.11.25

Airborne-Unlimited-11.12.25

Airborne-FltTraining-11.13.25

AirborneUnlimited-11.14.25

LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Sat, Oct 29, 2016

Generation Orbit Prepares For GO1 Wind Tunnel And Hot Fire Testing

Tests Will Be Conducted At AFRL's Rocket Lab At Edwards AFB

Generation Orbit Launch Services (GO) has announced the award of a SBIR Phase II Extension from the Air Force Research Laboratory, Aerospace Systems Directorate, High Speed Systems Division (AFRL/RQHV) to enable wind tunnel and integrated hot fire testing of the GO1 hypersonic testbed. These efforts will further the development of the vehicle by validating aerodynamic models and demonstrating the functionality of the fully integrated GO1 rocket vehicle system. Wind tunnel testing will be accomplished at the AFRL Trisonic Gas Dynamics Facility and Mach 6 Wind Tunnel Facility at Wright-Patterson Air Force Base, OH. Integrated hot fire testing will be conducted at AFRL’s Rocket Lab test facilities at Edwards Air Force Base, CA.

“By the time these two test campaigns are complete, we’ll be well ahead of the curve in terms of our knowledge and understanding of how the vehicle hardware and software work” commented A.J. Piplica, Chief Operating Officer at GO. “The team is excited to apply what we’re learning here toward finalizing the detailed design of GO1 and pressing forward toward vehicle production and test flights in short order.”

Development of GO1 continues to progress on schedule to provide a unique flight test capability to the hypersonic and suborbital research communities. The system will enable long-duration, affordable access to high Mach number, endoatmospheric flight conditions necessary for maturing technologies, components, and subsystems relevant to high speed system architectures for both government and commercial applications.

(Image provided with Generation Orbit news release)

FMI: http://generationorbit.com

Advertisement

More News

ANN's Daily Aero-Term (11.19.25): Option Approach

Option Approach An approach requested and conducted by a pilot which will result in either a touch-and-go, missed approach, low approach, stop-and-go, or full stop landing. Pilots >[...]

Aero-News: Quote of the Day (11.19.25)

"Emirates is already the world's largest Boeing 777 operator, and we are expanding our commitment to the program today with additional orders for 65 Boeing 777-9s. This is a long-t>[...]

NTSB Final Report: Sting Sport TL-2000

(Pilot) Reported That There Was A Sudden And Violent Vibration Throughout The Airplane That Lasted Several Seconds Analysis: The pilot was returning to his home airport at an altit>[...]

Aero-News: Quote of the Day (11.20.25)

“This recognition was evident during the TBMOPA Annual Convention, where owners and operators clearly expressed their satisfaction with our focus on customer service, and enc>[...]

ANN's Daily Aero-Term (11.20.25): Overhead Maneuver

Overhead Maneuver A series of predetermined maneuvers prescribed for aircraft (often in formation) for entry into the visual flight rules (VFR) traffic pattern and to proceed to a >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC