Generation Orbit Prepares For GO1 Wind Tunnel And Hot Fire Testing | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-11.17.25

AirborneNextGen-
11.11.25

Airborne-Unlimited-11.12.25

Airborne-FltTraining-11.13.25

AirborneUnlimited-11.14.25

LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Sat, Oct 29, 2016

Generation Orbit Prepares For GO1 Wind Tunnel And Hot Fire Testing

Tests Will Be Conducted At AFRL's Rocket Lab At Edwards AFB

Generation Orbit Launch Services (GO) has announced the award of a SBIR Phase II Extension from the Air Force Research Laboratory, Aerospace Systems Directorate, High Speed Systems Division (AFRL/RQHV) to enable wind tunnel and integrated hot fire testing of the GO1 hypersonic testbed. These efforts will further the development of the vehicle by validating aerodynamic models and demonstrating the functionality of the fully integrated GO1 rocket vehicle system. Wind tunnel testing will be accomplished at the AFRL Trisonic Gas Dynamics Facility and Mach 6 Wind Tunnel Facility at Wright-Patterson Air Force Base, OH. Integrated hot fire testing will be conducted at AFRL’s Rocket Lab test facilities at Edwards Air Force Base, CA.

“By the time these two test campaigns are complete, we’ll be well ahead of the curve in terms of our knowledge and understanding of how the vehicle hardware and software work” commented A.J. Piplica, Chief Operating Officer at GO. “The team is excited to apply what we’re learning here toward finalizing the detailed design of GO1 and pressing forward toward vehicle production and test flights in short order.”

Development of GO1 continues to progress on schedule to provide a unique flight test capability to the hypersonic and suborbital research communities. The system will enable long-duration, affordable access to high Mach number, endoatmospheric flight conditions necessary for maturing technologies, components, and subsystems relevant to high speed system architectures for both government and commercial applications.

(Image provided with Generation Orbit news release)

FMI: http://generationorbit.com

Advertisement

More News

Aero-News: Quote of the Day (11.17.25)

“We achieved full mission success today, and I am so proud of the team. It turns out Never Tell Me The Odds had perfect odds—never before in history has a booster this >[...]

ANN's Daily Aero-Term (11.17.25): NonDirectional Beacon

NonDirectional Beacon An L/MF or UHF radio beacon transmitting nondirectional signals whereby the pilot of an aircraft equipped with direction finding equipment can determine his/h>[...]

NTSB Final Report: Fred L Wellman CH 750 Cruzer

About 5ft Above Ground Level, The Airplane Stalled, And The Left Wing Dropped Analysis: The pilot reported that this flight was conducted as part of phase 1 flight testing of the n>[...]

ANN's Daily Aero-Linx (11.17.25)

Aero Linx: Brodhead Pietenpol Association The Brodhead Pietenpol Association is a newly reorganized (in 2017) non-profit educational corporation that grew and developed from an ear>[...]

Airborne-NextGen 11.11.25: Archer Buys Hawthorne, Joby Conforms, Stranded Astros

Also: VerdeGo Contract, Medi-Carrier, Gambit 6 UCAV, Blade Urban Air Mobility Pilot Archer Aviation has inked a deal for control of Hawthorne Municipal Airport (HHR), also known as>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC