NASA Mulls Early Move For Endeavour | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Thu, Oct 23, 2008

NASA Mulls Early Move For Endeavour

Managers Recommend Launch To ISS November 14

Following an extensive two-day meeting, Space Shuttle Program managers decided Wednesday to recommend to senior NASA managers next week that space shuttle Endeavour is ready to support its target launch date of November 14.

A final meeting, called the Flight Readiness Review, will be held at NASA's Kennedy Space Center on October 30-31 to officially set a launch date.

In the meantime, workers at Kennedy may get a head start on moving Endeavour to Launch Pad 39A. Although the move was first scheduled to take place Saturday, an inclement weather forecast convinced managers to try to roll Endeavour from pad B to pad A on Thursday at 0800 instead.

Early Thursday morning, NASA managers will decide when to move the shuttle based on the progress of removing the payload canister from the pad following installation into the pad’s changeout room and a good weather forecast.

The cargo module called Leonardo (shown below) was moved to Launch Pad 39A early Wednesday morning at Kennedy in preparation for loading it into Endeavour’s payload bay. Leonardo has been stocked with about 19,000 pounds of equipment and supplies that will set the stage for enlarging the crew size aboard the International Space Station.

Endeavour's seven astronauts are in NASA's Johnson Space Center's virtual reality lab practicing robotics operations, including returning Leonardo to the shuttle's payload bay.

FMI: www.nasa.gov

Advertisement

More News

Aero-News: Quote of the Day (05.09.24)

"Fly-by-wire flight, coupled with additional capability that are being integrated into ALFA, provide a great foundation for Bell to expand on its autonomous capabilities. This airc>[...]

ANN's Daily Aero-Term (05.09.24): Hold Procedure

Hold Procedure A predetermined maneuver which keeps aircraft within a specified airspace while awaiting further clearance from air traffic control. Also used during ground operatio>[...]

ANN's Daily Aero-Linx (05.09.24)

Aero Linx: B-21 Raider The B-21 Raider will be a dual-capable penetrating strike stealth bomber capable of delivering both conventional and nuclear munitions. The B-21 will form th>[...]

Airborne 05.03.24: Advanced Powerplant Solutions, PRA Runway Woes, Drone Racing

Also: Virgin Galactic, B-29 Doc to Allentown, Erickson Fire-Fighters Bought, FAA Reauthorization After dealing with a big letdown after the unexpected decision by Skyreach to disco>[...]

Airborne-NextGen 05.07.24: AI-Piloted F-16, AgEagle, 1st 2 WorldView Sats

Also: Skydio Chief, Uncle Sam Sues, Dash 7 magniX, OR UAS Accelerator US Secretary of the Air Force Frank Kendall was given a turn around the patch in the 'X-62A Variable In-flight>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC