Space Shuttle Program Completes New Plan For Next Launch | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.13.24

Airborne-NextGen-05.14.24

Airborne-Unlimited-05.15.24 Airborne-AffordableFlyers-05.16.24

Airborne-Unlimited-05.17.24

Thu, Feb 26, 2009

Space Shuttle Program Completes New Plan For Next Launch

Discovery Could Fly As Soon As March 12

Following weeks of seeming indecision about when NASA planned to launch its next shuttle mission to the International Space Station, NASA announced Wednesday a plan that could support launch of Discovery, now tentatively targeted for March 12.

NASA cautions an exact target launch date will be determined as work progresses with the shuttle's three gaseous hydrogen flow control valves. At NASA's Kennedy Space Center in Florida, technicians have started removing Discovery's three valves, two of which will undergo detailed inspection. Approximately 4,000 images of each valve will be reviewed for evidence of cracks.

Valves that have flown fewer times will be installed in Discovery. Engineering teams also will complete analysis and testing to understand the consequences if a valve piece were to break off and strike pressurization lines between the shuttle and external fuel tank. Hardware modifications may be made to the pressurization lines to add extra protection in the unlikely event debris is released.

NASA and contractor teams have been working to identify what caused damage to a flow control valve on shuttle Endeavour during its November 2008 flight. Part of the main propulsion system, the valves channel gaseous hydrogen from the main engines to the external tank. After a thorough review of shuttle Discovery's readiness for flight on February 20, NASA managers decided more understanding of the valve work was required before launching Discovery.

The Space Shuttle Program will hold a meeting March 4 to review new data and assess ongoing work. Managers then will determine whether to move forward with a flight readiness review March 6.

If Discovery's tentative launch date holds, NASA says there will be no effect on the next two shuttle launches: STS-125 to NASA's Hubble Space Telescope and STS-127 to the International Space Station.

FMI: www.nasa.gov/shuttle

Advertisement

More News

Classic Aero-TV: Remembering Bob Hoover

From 2023 (YouTube Version): Legacy of a Titan Robert (Bob) Anderson Hoover was a fighter pilot, test pilot, flight instructor, and air show superstar. More so, Bob Hoover was an i>[...]

ANN FAQ: Follow Us On Instagram!

Get The Latest in Aviation News NOW on Instagram Are you on Instagram yet? It's been around for a few years, quietly picking up traction mostly thanks to everybody's new obsession >[...]

ANN's Daily Aero-Linx (05.15.24)

Aero Linx: B-52H Stratofortress The B-52H Stratofortress is a long-range, heavy bomber that can perform a variety of missions. The bomber is capable of flying at high subsonic spee>[...]

ANN's Daily Aero-Term (05.15.24):Altimeter Setting

Altimeter Setting The barometric pressure reading used to adjust a pressure altimeter for variations in existing atmospheric pressure or to the standard altimeter setting (29.92).>[...]

Aero-News: Quote of the Day (05.16.24)

"Knowing that we play an active part in bettering people's lives is extremely rewarding. My team and I are very thankful for the opportunity to be here and to help in any way we ca>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC