AD: Airbus SAS Airplanes | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Tue, Aug 21, 2018

AD: Airbus SAS Airplanes

AD NUMBER: 2018-17-10

PRODUCT: Certain Airbus Model A300 B4-600R series airplanes, Model A300 C4-605R Variant F airplanes, and Model A300 F4-600R series airplanes.

ACTION: Final Rule.

SUMMARY: The FAA is superseding Airworthiness Directive (AD) 2017-15-17, which applied to the airplanes listed above.

AD 2017-15-17 required an inspection of the lower area of a certain frame (FR) radius for cracking, and corrective action if necessary. This AD requires new repetitive inspections of the forward fitting lower radius of a certain frame for cracking, and corrective actions if necessary.

This AD was prompted by a determination that repetitive inspections and applicable corrective actions are necessary.

DATES: This AD is effective September 24, 2018.

COST: The FAA estimates that  this AD affects 94 airplanes of U.S. registry.

  • The actions required by AD 2017-15-17, and retained in this AD, take about 4 work-hours per product, at an average labor rate of $85 per work-hour. Based on these figures, the estimated cost of the actions that are required by AD 2017-15-17 is $340 per product.
  • The FAA also estimates that it takes about 4 work-hours per product to comply with the new requirements of this AD, including 1 work-hour per product for reporting. The average labor rate is $85 per work-hour. Based on these figures, the estimated cost of this AD on U.S. operators to be $425 per product.
  • The agency has received no definitive data that enables it to provide cost estimates for the on-condition actions specified in this AD.
FMI: AD

Advertisement

More News

Airbus Racer Helicopter Demonstrator First Flight Part of Clean Sky 2 Initiative

Airbus Racer Demonstrator Makes Inaugural Flight Airbus Helicopters' ambitious Racer demonstrator has achieved its inaugural flight as part of the Clean Sky 2 initiative, a corners>[...]

Diamond's Electric DA40 Finds Fans at Dübendorf

A little Bit Quieter, Said Testers, But in the End it's Still a DA40 Diamond Aircraft recently completed a little pilot project with Lufthansa Aviation Training, putting a pair of >[...]

ANN's Daily Aero-Term (04.23.24): Line Up And Wait (LUAW)

Line Up And Wait (LUAW) Used by ATC to inform a pilot to taxi onto the departure runway to line up and wait. It is not authorization for takeoff. It is used when takeoff clearance >[...]

NTSB Final Report: Extra Flugzeugbau GMBH EA300/L

Contributing To The Accident Was The Pilot’s Use Of Methamphetamine... Analysis: The pilot departed on a local flight to perform low-altitude maneuvers in a nearby desert val>[...]

Classic Aero-TV: 'Never Give Up' - Advice From Two of FedEx's Female Captains

From 2015 (YouTube Version): Overcoming Obstacles To Achieve Their Dreams… At EAA AirVenture 2015, FedEx arrived with one of their Airbus freight-hauling aircraft and placed>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC