StandardAero Introduces PT6A-68 Series Engine Test Cell In Canada | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Mon, Jun 03, 2019

StandardAero Introduces PT6A-68 Series Engine Test Cell In Canada

Located At Company's Summerside Turboprop Engine MRO Center Of Excellence

StandardAero recently completed the correlation process for its newly upgraded Pratt & Whitney Canada PT6A-68 test cell at its Summerside, PEI facility in Canada.  The company is now able to complete pass-off testing for PT6A-68 series engines overhauled at the Summerside facility, for customers in Canada, the United States and elsewhere.

The 1,250 to 1,600 shp class PT6A-68 series powers a number of high performance training aircraft.

StandardAero has provided full service support for the PT6A-68 since 2013, previously from its Winnipeg, MB location.  Work on the engine was transferred to the Summerside facility as part of the company’s Center of Excellence (COE) activity, announced in May 2018.  The facility, located in Slemon Park adjacent to Summerside Airport, has recently expanded its shop floor area by 30% to 130,000 sq. ft., while expanding its workforce with the hiring of 80 additional employees.

“The introduction of the PT6A-68 test cell further augments the capabilities of StandardAero’s Summerside turboprop engine MRO Center of Excellence,” said Jeff Poirier, General Manager & Vice President of the Summerside facility.  “Our dedicated PT6A service team here has been overhauling PT6A-68 series engines for military operators since last year, and the correlation of the test cell will result in immediate turn-around time benefits for our customer base.”

StandardAero supports the global PT6A operator community from four Designated Overhaul Facilities located in North America, Europe, Africa and Australasia, backed up by a global network of seven service centers and over twenty dedicated mobile repair technicians.

(Source: StandardAero news release. Image from file)

FMI: www.standardaero.com

Advertisement

More News

Airbus Racer Helicopter Demonstrator First Flight Part of Clean Sky 2 Initiative

Airbus Racer Demonstrator Makes Inaugural Flight Airbus Helicopters' ambitious Racer demonstrator has achieved its inaugural flight as part of the Clean Sky 2 initiative, a corners>[...]

Diamond's Electric DA40 Finds Fans at Dübendorf

A little Bit Quieter, Said Testers, But in the End it's Still a DA40 Diamond Aircraft recently completed a little pilot project with Lufthansa Aviation Training, putting a pair of >[...]

ANN's Daily Aero-Term (04.23.24): Line Up And Wait (LUAW)

Line Up And Wait (LUAW) Used by ATC to inform a pilot to taxi onto the departure runway to line up and wait. It is not authorization for takeoff. It is used when takeoff clearance >[...]

NTSB Final Report: Extra Flugzeugbau GMBH EA300/L

Contributing To The Accident Was The Pilot’s Use Of Methamphetamine... Analysis: The pilot departed on a local flight to perform low-altitude maneuvers in a nearby desert val>[...]

Classic Aero-TV: 'Never Give Up' - Advice From Two of FedEx's Female Captains

From 2015 (YouTube Version): Overcoming Obstacles To Achieve Their Dreams… At EAA AirVenture 2015, FedEx arrived with one of their Airbus freight-hauling aircraft and placed>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC