Ready To Fly: B787 Dreamliner Sked To Fly, 12.15.09, 1800 GMT | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Sun, Dec 13, 2009

Ready To Fly: B787 Dreamliner Sked To Fly, 12.15.09, 1800 GMT

Final High-Speed Taxi Tests Completed Satisfactorily

Ready for flight... that's the feeling from many at Boeing as their 787 Dreamliner completed some of the final steps left before an actual test flight. Boeing completed high-speed taxi tests on the first 787 Dreamliner Saturday and confirmed that this is the last in a series of functional tests planned in preparation for first flight.

“Our pilots told me the airplane performed beautifully,” said Mike Delaney, vice president and chief project engineer for the 787. “We’re going through and analyzing the data to ensure we’re ready for first flight. From evaluations we’ve done so far, everything looks good.”

During the testing, the airplane reached a top speed of approximately 130 knots (150 mph, 240 kph), and the pilots lifted the nose gear from the pavement. Earlier in the week Boeing confirmed that a review and analysis of a Nov. 30 static test to validate the side-of-body modifications on the 787 Dreamliner had been completed, and the airplane structure validated for first flight.

During the test on the 787 Dreamliner static test airframe, the wing and trailing edges of the airframe were subjected to their limit load – the highest loads expected to be seen in service. During the test, the wing successfully deflected 18 feet, some 105 percent of the limit load. Anything over 100 percent is considered a successful test.

FMI: www.boeing.com, www.newairplane.com

Advertisement

More News

ANN's Daily Aero-Term (04.25.24): Airport Rotating Beacon

Airport Rotating Beacon A visual NAVAID operated at many airports. At civil airports, alternating white and green flashes indicate the location of the airport. At military airports>[...]

ANN's Daily Aero-Linx (04.25.24)

Aero Linx: Fly for the Culture Fly For the Culture, Inc. is a 501(c)(3) non-profit organization that serves young people interested in pursuing professions in the aviation industry>[...]

Klyde Morris (04.22.24)

Klyde Is Having Some Issues Comprehending The Fed's Priorities FMI: www.klydemorris.com>[...]

Airborne 04.24.24: INTEGRAL E, Elixir USA, M700 RVSM

Also: Viasat-uAvionix, UL94 Fuel Investigation, AF Materiel Command, NTSB Safety Alert Norges Luftsportforbund chose Aura Aero's little 2-seater in electric trim for their next gli>[...]

Airborne 04.22.24: Rotor X Worsens, Airport Fees 4 FNB?, USMC Drone Pilot

Also: EP Systems' Battery, Boeing SAF, Repeat TBM 960 Order, Japan Coast Guard H225 Buy Despite nearly 100 complaints totaling millions of dollars of potential fraud, combined with>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC