Rockwell Collins Gets Green Light For C/KC-135 GATM Upgrade | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Wed, Apr 07, 2004

Rockwell Collins Gets Green Light For C/KC-135 GATM Upgrade

Deliveries Set For April 2005

The US Air Force has authorized Rockwell Collins to begin the $36.9M Lot II, the first phase of full rate production, as part of the C/KC-135 Global Air Traffic Management (GATM) program.  This first production phase calls for the building, delivery and installation of 30 additional R-model aircraft ship sets with deliveries beginning in April 2005.  If fully executed, the GATM program could generate $600 million in revenue for Rockwell Collins.

"We are proud of this milestone and look forward to continued success with the C/KC-135 GATM program," said Rockwell Collins Chairman, President and Chief Executive Officer Clay Jones. "This milestone is a reflection of our ongoing commitment to meet budget and schedule targets for government projects."

Last summer, Rockwell Collins officials presented the US Air Force with the first C/KC-135 production aircraft equipped with Global Air Traffic Management (GATM) technology during a ceremony in San Antonio.

Prior to this first production authorization, the $55 million Phase 1 low-rate initial production option included delivery and installation of avionics for 50 C/KC-135 tanker/transport aircraft.  The Air Force then authorized the $32 million second phase of low-rate initial production as part of the GATM program. The second phase called for the building, delivery and installation of 25 additional R-model aircraft ship sets.

As the prime avionics systems integrator for the US Air Force C/KC-135 GATM program, Rockwell Collins is providing technology that prepares aircraft for changing communication/navigation/surveillance and air traffic management (CNS/ATM) requirements as the airspace transitions to Free Flight operation.

FMI: www.rockwellcollins.com

Advertisement

More News

ANN's Daily Aero-Linx (05.04.24)

Aero Linx: JAARS Nearly 1.5 billion people, using more than 5,500 languages, do not have a full Bible in their first language. Many of these people live in the most remote parts of>[...]

NTSB Final Report: Quest Aircraft Co Inc Kodiak 100

'Airplane Bounced Twice On The Grass Runway, Resulting In The Nose Wheel Separating From The Airplane...' Analysis: The pilot reported, “upon touchdown, the plane jumped back>[...]

Aero-News: Quote of the Day (05.04.24)

"Burt is best known to the public for his historic designs of SpaceShipOne, Voyager, and GlobalFlyer, but for EAA members and aviation aficionados, his unique concepts began more t>[...]

Aero-News: Quote of the Day (05.05.24)

"Polaris Dawn, the first of the program’s three human spaceflight missions, is targeted to launch to orbit no earlier than summer 2024. During the five-day mission, the crew >[...]

Read/Watch/Listen... ANN Does It All

There Are SO Many Ways To Get YOUR Aero-News! It’s been a while since we have reminded everyone about all the ways we offer your daily dose of aviation news on-the-go...so he>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC